BLD00-02671
| FIRE-Final Inspection | 11/7/2000 | 11/9/2000 | 11/9/2000 12:00:00 AM | A | NR |
|
|
###-#### or ###-#### sprinklers not complete and hood system not complete to the main FACP 11/9/2000 9:50:21 AM
|
BLD00-00740
| FIRE-Final Inspection | 11/7/2000 | 11/9/2000 | 11/9/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 409 On 11/7/2000 4:04:05 PM
|
FIR00-00418
| INSP-Sprinkler Rough-in | 11/7/2000 | 11/9/2000 | 11/9/2000 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 409 On 11/7/2000 4:05:07 PM 9:00 ###-#### oksy to cover 4th floor only 11/9/2000 9:49:26 AM
|
FIR00-00424
| INSP-Final Inspection | 11/6/2000 | 11/9/2000 | 11/9/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Need remote indicators for AHU detectors; door exiting 11/13/2000 8:03:56 AM
|
FIR99-00614
| INSP-Supply line flush | 11/7/2000 | 11/9/2000 | 11/9/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 409 On 11/7/2000 12:04:27 PM alarms 11/13/2000 8:04:19 AM
|
FIR00-00525
| INSP-Final Inspection | 11/9/2000 | 11/9/2000 | 11/9/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 09:07:37. Contact: ###-####. installed per approved plans 11/13/2000 8:04:51 AM
|