FIR05-00647
| INSP-Sprinkler Rough-in/Hydro | 11/8/2005 | 11/9/2005 | 11/9/2005 5:09:48 PM | A | PART |
|
|
Overhead rough-in is satisfactory, AG and UG hydrostatic tests also passed inspection, will final when alarms are connected and forward flow is performed.
|
BLD05-01733
| FIRE-Final Inspection | 11/9/2005 | 11/9/2005 | 11/9/2005 3:51:39 PM | P | FAIL |
|
|
Project will require fire sprinkler modifications as the newly installed duct is over 4' and significantly blocks coverage of the sprinklers from above, a fire sprinkler permit will be needed to perform this work.
|
FIR05-00413
| INSP-Final Inspection | 11/8/2005 | 11/9/2005 | 11/9/2005 3:34:41 PM | P | PASS |
|
|
Fire alarm passed inspection.
|
FIR05-00372
| INSP-Final Inspection | 11/9/2005 | 11/9/2005 | 11/9/2005 1:40:54 PM | P | FAIL |
|
|
An additional 11 item correcton notice was given to the subcontractor, inspection stopped at this point due to the excessive number of defficiencies. Mezzanine not inspected for final yet, contractor to walk project again and call for re-inspection when project is code compliant. Re-inspection fees apply.
|
FIR05-00076
| INSP-Alarm Testing | 11/9/2005 | 11/9/2005 | 11/9/2005 1:17:49 PM | P | PART |
|
|
The north elevator remains to be completed and tested, final pending verification of resubmittals for field changes.
|
FIR05-00499
| INSP-Final Inspection | 11/9/2005 | 11/9/2005 | 11/9/2005 1:14:28 PM | P | PART |
|
|
UG fire supply line is acceptable to cover pending verification and approval of field modifications from original approved plans via resubmittals.
|
FIR05-00039
| INSP-Final Inspection | 11/8/2005 | 11/9/2005 | 11/9/2005 9:32:34 AM | A | PASS |
|
|
UG fire supply line permit finaled.
|
FIR05-00585
| INSP-Final Inspection | 11/7/2005 | 11/9/2005 | 11/9/2005 9:22:19 AM | A | PASS |
|
|
Fire alarm finaled.
|
FIR05-00580
| INSP-Final Inspection | 11/7/2005 | 11/9/2005 | 11/9/2005 9:21:42 AM | A | PASS |
|
|
Fire alarm passed inspection.
|