MIS06-00298
| FIR-Final | 11/9/2006 | 11/9/2006 | 11/9/2006 12:49:08 PM | P | PASS |
|
|
Corrections have been completed, life safety inspection passed.
|
BLD05-03029
| FIRE-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 12:47:02 PM | P | PART |
|
|
Corrections for Building 1414 per previous c/n have been verified for completion, inspeciton passed.
|
BLD04-00945
| FIRE-Conference | 11/9/2006 | 11/9/2006 | 11/9/2006 12:45:38 PM | P | DONE |
|
|
Tenting inspection for the 3rd floor building #10 as completed by S. Arellano is satisfactory.
|
FIR06-00783
| INSP-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 12:30:15 PM | A | DEFR |
|
|
Inspection to be completed by M. Timmerman.
|
MIS06-00296
| FIR-Final | 11/9/2006 | 11/9/2006 | 11/9/2006 12:12:00 PM | P | PASS |
|
|
Life safety inspection passed.
|
MIS06-00298
| FIR-Final | 11/9/2006 | 11/9/2006 | 11/9/2006 12:06:07 PM | P | FAIL |
|
|
Need to remove the manual thumbturn locking mechanism at the main entry/exit door.
|
FIR06-00496
| INSP-Sprinkler Rough-in | 11/7/2006 | 11/9/2006 | 11/9/2006 12:04:31 PM | A | PART |
|
|
OH rough-in is approved for cover.
|
FIR06-00437
| INSP-Final Inspection | 11/7/2006 | 11/9/2006 | 11/9/2006 12:03:43 PM | A | DEFR |
|
|
To be rescheduled per conversation with contractor.
|
FIR06-00109
| INSP-Sprinkler Rough-in/Hydro | 11/6/2006 | 11/9/2006 | 11/9/2006 12:02:48 PM | A | PART |
|
|
The remainder of OH rough-in is good for cover as indicated on approved plans, final pending drop in ceiling installation.
|
MIS06-00293
| FIR-Final | 11/9/2006 | 11/9/2006 | 11/9/2006 11:11:38 AM | P | PASS |
|
|
Items on previous c/n have been verified for completion, inspeciton passed.
|
BLD04-03025
| FIRE-Conference | 11/8/2006 | 11/9/2006 | 11/9/2006 10:19:44 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 11/8/2006 at 11:35:12 AM. Contact: ###-####. Contractor not available.
|
BLD06-00895
| FIRE-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 10:18:48 AM | A | PASS |
|
|
Final fire life safety inspeciton passed, contractor to replace missing ceiling tile and sprinkler escutcheon at the data closet prior to occupancy as agreed.
|
FIR06-00492
| INSP-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 9:47:58 AM | A | PASS |
|
|
Final inspection was completed and passed on 10/20/06 by T. Cobbley, permit finaled.
|
FIR06-00556
| INSP-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 9:44:34 AM | A | PASS |
|
|
Per final inspection completed by S. Arellano, fire sprinkler work is acceptable, permit finaled.
|
BLD05-02731
| FIRE-Final Inspection | 11/9/2006 | 11/9/2006 | 11/9/2006 9:42:47 AM | A | PASS |
|
|
Required corrections have been verified for completion, shell fire life safety passed.
|
FIR06-00131
| INSP-Final Inspection | 11/9/2006 | 11/9/2006 | 11/9/2006 9:37:36 AM | P | PASS |
|
|
Fire alarm final inspection completed and passed by T. Cobbley on 10/26/06. Permit finaled.
|
FIR06-00065
| INSP-Final Inspection | 11/9/2006 | 11/9/2006 | 11/9/2006 9:36:11 AM | P | PASS |
|
|
Fire sprinkler work is complete, permit finaled.
|
FIR06-00043
| INSP-Final Inspection | 11/9/2006 | 11/9/2006 | 11/9/2006 9:35:36 AM | P | PASS |
|
|
UG fire supply line permit finaled.
|
FIR06-00847
| INSP-Sprinkler Rough-in/Hydro | 11/8/2006 | 11/9/2006 | 11/9/2006 9:30:36 AM | A | PART |
|
|
OH rough-in is good for cover at the drop ceiling areas.
|
FIR06-00771
| INSP-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 9:29:11 AM | A | FAIL |
|
|
Need to repair the leak above the ceiling prior to final.
|
BLD06-02126
| FIRE-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 8:54:43 AM | P | PASS |
|
|
Fire life safety is acceptable pending the installation of the remainder of the field ceiling tile prior to occupancy.
|
BLD06-02128
| FIRE-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 8:53:27 AM | A | PASS |
|
|
Fire life safety is satisfactory, inspection passed.
|
BLD06-02127
| FIRE-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 8:52:44 AM | A | PASS |
|
|
Fire life safety is satisfactory.
|
BLD05-03335
| FIRE-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 8:52:00 AM | A | PASS |
|
|
Fire life safety passed final inspeciton.
|
FIR06-00605
| INSP-Final Inspection | 11/9/2006 | 11/9/2006 | 11/9/2006 8:51:27 AM | P | PASS |
|
|
Correction items are complete, permit finaled.
|
FIR06-00496
| INSP-Sprinkler Rough-in/Hydro | 11/7/2006 | 11/9/2006 | 11/8/2006 2:46:51 PM | A | NR |
|
|
To be rescheduled.
|