Inspections for the day of: Friday, November 9, 2007.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00546 INSP-Conference11/8/200711/9/200711/9/2007 4:10:32 PMADONE
I spoke to mike, the superintendant, about the combustible concealed spaces located around the exterior of the building. They are required to be sprinklered per NFPA 4.1 unless the meet one of the exceptions of 8.14
FIR07-00761 INSP-Sprinkler Rough-in/Hydro11/9/200711/9/200711/9/2007 3:58:22 PMPPASS
See the city approved plans where the overhead piping is ok to cover.
BLD05-00633 FIRE-Final Inspection11/8/200711/9/200711/9/2007 3:56:45 PMAPART
The 4th and 5th floors of the central tower are ok to occupy. The interconnections at teh 4th and 5th floors to the north tower are not complete yet and are to be blocked off until work is complete.
FIR06-00011 INSP-Alarm Testing11/8/200711/9/200711/9/2007 3:54:36 PMADONE
The fire alarm testing of the 4th and 5th floors of the central tower are complete. The 4th and 5th floor connections to the north tower are not complete.
BLD06-03140 FIRE-Final Inspection11/9/200711/9/200711/9/2007 1:23:04 PMPPASS
life safety passed.
FIR07-00386 INSP-Alarm Testing11/8/200711/9/200711/9/2007 1:22:28 PMACANC
To be rescheduled for tuesday since the fire alarm contractor could not make the 8:00am meeting time.
BLD06-02010 FIRE-Conference11/8/200711/9/200711/9/2007 1:22:10 PMACANC
To be rescheduled for tuesday since the fire alarm contractor could not make the 8:00am meeting time.
BLD07-02909 FIRE-Final Inspection11/8/200711/9/200711/9/2007 1:21:02 PMAPART
A temporary occupancy was given until the exit signs/emergency lights are either repaired or removed since they are not required.