BLD08-00181
| FIRE-Conference | 11/9/2009 | 11/9/2009 | 11/9/2009 4:16:33 PM | P | DONE |
|
|
Regarding project related fire code review notes and provisions for fire life safety.
|
FIR09-00626
| INSP-Sprinkler Rough-in/Hydro | 11/9/2009 | 11/9/2009 | 11/9/2009 4:13:48 PM | P | PART |
|
|
Overhead hydrostatic test passed after one leaking head repaired while on site.
|
FIR09-00529
| INSP-Final Inspection | 11/6/2009 | 11/9/2009 | 11/9/2009 4:12:29 PM | A | PASS |
|
|
Fire alarm passed site inspection, permit final approved.
|
FIR09-00587
| INSP-Final Inspection | 11/9/2009 | 11/9/2009 | 11/9/2009 12:25:28 PM | P | CANC |
|
|
Chris Farnsworth Phone #: ###-#### Inspection cancelled from web by: Diane Turner
|
FIR09-00559
| INSP-Final Inspection | 11/6/2009 | 11/9/2009 | 11/9/2009 11:44:49 AM | A | PASS |
|
|
Fire alarm work passed field inspection, permit final okayed.
|
FIR09-00626
| INSP-Sprinkler Rough-in | 11/9/2009 | 11/9/2009 | 11/9/2009 11:43:23 AM | A | PART |
|
|
Overhead fire sprinkler modifications and minor field adjustments in spacing and head locations are approved for ceiling cover at the remodel areas. Quick response head change out for the floor level per scope of work also completed satisfactory.
|
BLD09-01957
| FIRE-Final Inspection | 11/6/2009 | 11/9/2009 | 11/9/2009 11:36:53 AM | A | PASS |
|
|
Reinspection for noted correction items completed acceptable, life safety passed.
|