Inspections for the day of: Monday, November 9, 2009.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00244 FIRE-Conference11/9/200911/9/200911/10/2009 11:39:37 AMPDONE
I stopped by this project site (11-9-09) to verify that sprinkler piping was not being covered by sheetrock and found that the fire alarm system had been installed without drawings even being submitted. I posted a stop work order for the installation of the fire alarm system and any other trades whos work would effect the fire alarm system. The fire alarm contractor was not on site so I left a voice message on the building contractors phone of the situation. The stop work order is to remain in effect until the fire alarm plans have been issued.
FIR09-00600 INSP-Supply line flush11/9/200911/9/200911/9/2009 3:04:20 PMPCANC
The underground flush is to be rescheduled per Brian.
FIR09-00600 INSP-Sprinkler Rough-in/Hydro11/9/200911/9/200911/9/2009 2:39:21 PMPPASS
The underground hydro test passed.
FIR09-00459 FIR-Aging Inspection11/9/200911/9/200911/9/2009 1:10:39 PM NR
Work is in progress
BLD09-01951 FIRE-Final Inspection11/9/200911/9/200911/9/2009 1:09:42 PMPPASS
LIfe safety passed
FIR09-00560 INSP-Final Inspection11/6/200911/9/200911/9/2009 11:52:06 AMAPASS
Permit finaled.