BLD08-00870
| FIRE-Conference | 9/6/2011 | 11/3/2011 | | A | |
|
|
Follow up on conversation with Todd at Solution Pro. Could you please this and see if it ever was resolved? BARB @ Permit Desk Phone #: ###-####
|
FIR11-00451
| INSP-Final Inspection | 11/8/2011 | 11/9/2011 | 11/9/2011 3:50:50 PM | A | PASS |
|
|
permit finaled
|
FIR11-00455
| INSP-Final Inspection | 11/9/2011 | 11/9/2011 | 11/9/2011 3:14:01 PM | P | CANC |
|
|
Per tim the AES is only getting a 6 Netcon so he wanted to cancel the inspection. No inspection was performed.
|
BLD08-00226
| FIRE-Conference | 11/9/2011 | 11/9/2011 | 11/9/2011 3:09:56 PM | P | DONE |
|
|
Inspection was actually for an underground supply flush for the future fire sprinkler system. The flush passed.
|
FIR08-00194
| INSP-Final Inspection | 11/7/2011 | 11/9/2011 | 11/9/2011 3:08:45 PM | P | PASS |
|
|
permit finaled
|
BLD11-02134
| FIRE-Conference | 11/9/2011 | 11/9/2011 | 11/9/2011 2:54:18 PM | P | DONE |
|
|
Went over exit door hardware requirements with the general contractor.
|
FIR11-00579
| INSP-Sprinkler Rough-in | 11/9/2011 | 11/9/2011 | 11/9/2011 2:52:52 PM | P | PASS |
|
|
The piping above the mens and womens 2nd floor restrooms is ok to cover.
|
BLD10-01430
| FIRE-Final Inspection | 11/8/2011 | 11/9/2011 | 11/9/2011 11:17:31 AM | A | PASS |
|
|
life safety passed
|
BLD11-02627
| FIRE-Final Inspection | 11/8/2011 | 11/9/2011 | 11/9/2011 11:16:47 AM | A | FAIL |
|
|
See the city approved plans for items redlined that need to be addressed. They include sprinkler modifications, rear door hardware, sticker at the front door and missing fire extinguisher.
|
BLD11-01759
| FIRE-Final Inspection | 11/8/2011 | 11/9/2011 | 11/9/2011 9:28:03 AM | A | PASS |
|
|
Life safety passed.
|
FIR11-00482
| INSP-Alarm Testing | 11/7/2011 | 11/9/2011 | 11/9/2011 9:15:28 AM | A | FAIL |
|
|
The city approved plans are missing the second floor plan sheet. Also need the smoke detectors centered on the doors. This includes the first floor conference and second floor conference rooms.
|