ESC11-00609
| General Inspection | 11/9/2011 | 11/9/2011 | 11/10/2011 2:50:50 PM | | PASS |
|
|
|
ESC11-00103
| General Inspection | 11/9/2011 | 11/9/2011 | 11/10/2011 1:39:44 PM | P | PASS |
|
|
site is clean
|
ESC11-00192
| Aging Inspection | 11/9/2011 | 11/9/2011 | 11/9/2011 3:52:39 PM | P | CANC |
|
|
|
ESC11-00223
| General Inspection | 11/9/2011 | 11/9/2011 | 11/9/2011 2:24:41 PM | | PART |
|
|
Verbal to RP: Prior to the 11/11/11 to clean up all hard surfaces of all sediment and debris.
|
ESC09-00352
| General Inspection | 11/9/2011 | 11/9/2011 | 11/9/2011 2:21:24 PM | | PART |
|
|
Still working on Walling corridor. Multiple area of the project have disturbed soil. sediment BMP's working correctly within the Wallings Corridor channel that outfalls into the Boise River.
|
ESC11-00732
| General Inspection | 11/9/2011 | 11/9/2011 | 11/9/2011 2:19:41 PM | | FAIL |
|
|
Verbal to RP: Provide sediment barriers along the project perimeter next to the intake station where grading has occur to the river bank. Also re-install sediment barriers whaere they have been removed to perform utility work. Will re-inspect on 11/14/2011
|