BLD15-03388
| BLD-Final | 11/6/2015 | 11/9/2015 | 11/9/2015 2:26:07 PM | P | DONE |
|
|
Install 1 set of letters reading Tek Hut. All primary power by others Phone #: ###-#### Inspection requested via web by Ken Olsen
|
BLD15-03388
| DOC - Permit Finaled | 11/9/2015 | 11/9/2015 | 11/9/2015 2:25:25 PM | P | PASS |
|
|
|
BLD15-01259
| BLD-Ceiling Grid Inspection | 11/9/2015 | 11/9/2015 | 11/9/2015 1:29:40 PM | P | PASS |
|
|
would like call ahead; James Phone #: ###-####. Grid in play area only ok.
|
BLD15-02169
| BLD-Energy code compliance | 11/6/2015 | 11/9/2015 | 11/9/2015 11:24:09 AM | A | PASS |
|
|
Josh Phone #: ###-####
|
BLD15-02169
| BLD-Framing/Rough-in | 11/6/2015 | 11/9/2015 | 11/9/2015 11:23:57 AM | A | PASS |
|
|
Josh Phone #: ###-####
|
BLD15-01601
| BLD-Wall Bracing | 11/5/2015 | 11/9/2015 | 11/9/2015 10:15:11 AM | A | FAIL |
|
|
Travis Phone #: ###-####. Detail procided by architect only provides 1hr. from the exterior side, 1hr. is required from both sides of exterior wall. Plan design shows that the parapet is to be constructed 2x framing to provide the required 1hr. construction on either side. in place construction used jack truss to provide parapet construction. Called travis to advise him of non compliance. Also spoke with plan review (Tim W. ) to discuss the non compliance. Architect and contractor to resubmit to plan review to show design change and details of an approved assembly to show compliance with the approved plans.
|
BLD15-01671
| BLD-Final | 11/6/2015 | 11/9/2015 | 11/9/2015 9:12:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Casey Calico
|
BLD15-01671
| DOC - Permit Finaled | 11/9/2015 | 11/9/2015 | 11/9/2015 9:12:20 AM | P | PASS |
|
|
All isues were resolved. Vinyl wall curtain was remove, could not provide any test data.
|