FIR16-00088
| INSP-Sprinkler Rough-in | 11/8/2016 | 11/9/2016 | 11/9/2016 4:33:25 PM | P | PASS |
|
|
Rough to cover on 6th floor. Dwelling units Ok to cover except connections to riser and trash shute loop.
Dry pendants were in but need to be adjusted so that deflectors are level.
From last inspection, Rm 302 requires additional sprinkler at upper ceiling. This was corrected ahead of time for the corrresponding room on the 6th floor.
|
FIR16-00569
| INSP-Sprinkler Rough-in | 11/9/2016 | 11/9/2016 | 11/9/2016 3:32:23 PM | P | CANC |
|
|
Will be rescheduled for tomorrow. Arrived on site but contractor had left already for the day. Adam Phone #: ###-####
|
FIR16-00534
| INSP-Sprinkler Rough-in | 11/9/2016 | 11/9/2016 | 11/9/2016 3:04:56 PM | P | PASS |
|
|
Completed rough-in of grid ceiling. Ok to cover.
|
FIR16-00695
| INSP-Sprinkler Rough-in | 11/9/2016 | 11/9/2016 | 11/9/2016 2:32:12 PM | P | PASS |
|
|
Rough-in completed. Ok to cover.
|
NAF16-00055
| INSP-Supply line flush | 11/8/2016 | 11/9/2016 | 11/9/2016 1:34:15 PM | P | DONE |
|
|
Supply line flush completed satisfactory.
|
FIR16-00585
| INSP-Final Inspection | 11/9/2016 | 11/9/2016 | 11/9/2016 11:09:31 AM | P | PASS |
|
|
Scope of work complete. Permit Finaled.
|
FIR16-00681
| INSP-Final Inspection | 11/8/2016 | 11/9/2016 | 11/9/2016 11:08:31 AM | P | PASS |
|
|
Verified new bell is functional and old bells removed. Scope of work complete. Permit Finaled
|