MIS17-00127
| MIS-Aging Inspection | 11/9/2017 | 11/9/2017 | 11/9/2017 4:21:49 PM | | DEFR |
|
|
to 330
|
PLM17-04429
| Water and/or Sewer | 11/9/2017 | 11/9/2017 | 11/9/2017 3:56:00 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Charles Parks ok to cover connection at meter, will call when dcva is tested and expansion tank is installed
|
PLM17-04426
| Water and/or Sewer | 11/9/2017 | 11/9/2017 | 11/9/2017 3:54:59 PM | P | PART |
|
|
water line ok sewer not ready
|
PLM17-02412
| Plumbing Rough-in | 11/8/2017 | 11/9/2017 | 11/9/2017 2:53:54 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen ri ok with 2" vent above the front door hung
|
PLM17-02411
| Plumbing Rough-in | 11/8/2017 | 11/9/2017 | 11/9/2017 2:53:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03233
| Final | 11/8/2017 | 11/9/2017 | 11/9/2017 2:26:36 PM | P | PASS |
|
|
Please call Eric at ###-#### a half hour before showing up. There are dogs in the house. Phone #: ###-#### Inspection requested via web by Jason Gonzalez
|
PLM17-04054
| Final | 11/9/2017 | 11/9/2017 | 11/9/2017 2:26:21 PM | P | PASS |
|
|
James Phone #: ###-#### changed water to the sink in room 1E269 from non-potable to potable
|
PLM17-03611
| Final | 11/8/2017 | 11/9/2017 | 11/9/2017 1:41:39 PM | A | FAIL |
|
|
Jody Phone #: ###-#### 1) resubmit plans showing bar and fixtures 2) pipe water heater pan drain and relief line 3) set all fixtures 4) provide individual drains for all ice bins and prep sinks
|
PLM17-04419
| Water and/or Sewer | 11/8/2017 | 11/9/2017 | 11/9/2017 12:39:08 PM | P | PART |
|
|
Darrel Carter - foreman on site. Sewer only Phone #: ###-#### Inspection requested via web by Mike Basabe sewer tie in to 1st manhole to old school.
|
PLM17-04425
| Water and/or Sewer | 11/8/2017 | 11/9/2017 | 11/9/2017 12:15:07 PM | P | PASS |
|
|
Please call Tim 30 min prior to arrival at ###-####. Phone #: ###-#### Inspection requested via web by Maira Napoles
|
PLM17-04425
| Final | 11/9/2017 | 11/9/2017 | 11/9/2017 12:14:54 PM | P | PASS |
|
|
Please call Tim 30 min prior to arrival at ###-####. Phone #: ###-#### Inspection requested via web by Maira Napoles
|
PLM17-04407
| Plumbing Rough-in | 11/8/2017 | 11/9/2017 | 11/9/2017 11:57:53 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Josh Kelley
|
PLM17-04390
| Water and/or Sewer | 11/9/2017 | 11/9/2017 | 11/9/2017 11:54:49 AM | P | PASS |
|
|
Please call Gregg @ ###-#### prior to inspection Inspection requested via web by Gregg Barney
|
PLM17-04390
| Final | 11/9/2017 | 11/9/2017 | 11/9/2017 11:54:34 AM | P | PASS |
|
|
Please call Gregg @ ###-#### prior to inspection Inspection requested via web by Gregg Barney
|
MEC17-03948
| Final | 11/9/2017 | 11/9/2017 | 11/9/2017 11:22:09 AM | P | PASS |
|
|
Bradon Phone #: ###-####
|
PLM17-03341
| Final | 11/9/2017 | 11/9/2017 | 11/9/2017 11:21:25 AM | P | PART |
|
|
Bradon Phone #: ###-#### master bath isn't ready yet.
|
PLM17-04427
| Plumbing Rough-in | 11/8/2017 | 11/9/2017 | 11/9/2017 11:05:57 AM | A | PASS |
|
|
sliding glass door in back is open if no one around. Phone #: ###-#### Inspection requested via web by travis prawitz ri ok, rework the water heater relief line to pump at final.
|
PLM17-04346
| Water and/or Sewer | 11/3/2017 | 11/9/2017 | 11/9/2017 10:45:20 AM | A | NR |
|
|
please contact Brian Jones at ###-#### with inspection time Phone #: ###-#### Inspection requested via web by clifton cox ran into problems, wont be ready today
|
PLM17-04233
| Water and/or Sewer | 11/8/2017 | 11/9/2017 | 11/9/2017 10:44:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Troy Hatfield
|
PLM17-04233
| Final | 11/9/2017 | 11/9/2017 | 11/9/2017 10:44:32 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Troy Hatfield
|
PLM17-01482
| PLM-Aging Inspection | 11/9/2017 | 11/9/2017 | 11/9/2017 8:11:20 AM | | PASS |
|
|
|