MEC18-05176
| Final | 11/9/2018 | 11/9/2018 | 11/9/2018 3:47:58 PM | P | NH |
|
|
Please call owner April when in route to home ###-#### Phone #: ###-#### Inspection requested via web by Carolyn Rudd- called number in notes no one answered- no access
|
MEC18-05264
| Rough-in | 11/9/2018 | 11/9/2018 | 11/9/2018 3:31:36 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jon VanderStelt- R/I ok
|
MEC18-04924
| Rough-in | 11/9/2018 | 11/9/2018 | 11/9/2018 3:23:29 PM | P | PASS |
|
|
Crawl space is complete Other notated items have been remedied Phone #: ###-#### Inspection requested via web by Lynn Johnston R/I ok- check insulaion in crawl at final
|
MEC18-05232
| Pressure Test | 11/9/2018 | 11/9/2018 | 11/9/2018 3:00:08 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt- gauge was under 20lb
|
MEC18-05299
| Final | 11/8/2018 | 11/9/2018 | 11/9/2018 2:33:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace ac coil co ok
|
MEC18-05020
| Rough-in | 11/8/2018 | 11/9/2018 | 11/9/2018 2:19:19 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek - dryer vent needs a nail plate -exhaust fan upstairs needs connection sealed -two supply runs upstairs need secured to framing -line set insulation at attic access needs fixed - need a passage way to furnace from attic access at least 24" wide. need to also check and make sure there is at least 30" level service space where required service is needed on furnace
|
MEC18-05020
| Pressure Test | 11/8/2018 | 11/9/2018 | 11/9/2018 2:15:53 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- 20lb gas pressure test ok
|
MEC18-05399
| Final | 11/8/2018 | 11/9/2018 | 11/9/2018 1:42:01 PM | P | NH |
|
|
Please call Jason to ensure install is complete. Thank you! ###-#### Phone #: ###-#### Inspection requested via web by Rick Borg - no access to home
|
MEC18-04023
| Rough-in | 11/9/2018 | 11/9/2018 | 11/9/2018 1:10:23 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- area c 1st floor unisex bathrooms ok for cover- area c 2nd floor elevator corridors ok for cover also seen access door locations
|
MEC18-04957
| Pressure Test | 11/9/2018 | 11/9/2018 | 11/9/2018 1:07:47 PM | P | FAIL |
|
|
Daniel from Bowman''s Inc should be on site. Above is his phone number. Phone #: ###-#### Inspection requested via web by Christy Bowman- gas lines cant be ran below grade. they need to be re ran above grade and then pressure tested
|
MEC18-01509
| Final | 11/2/2018 | 11/9/2018 | 11/9/2018 11:13:44 AM | A | NH |
|
|
MARCI ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza
|
MEC18-01509
| Rough-in | 11/2/2018 | 11/9/2018 | 11/9/2018 11:13:35 AM | A | NH |
|
|
MARCI ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza
|
MEC18-05146
| Rough-in | 11/8/2018 | 11/9/2018 | 11/9/2018 11:11:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero- fireplace R/I ok- still need to see a gas pressure test on new gas line once installed by others
|
MEC18-05283
| Conference | 11/8/2018 | 11/9/2018 | 11/9/2018 10:34:21 AM | A | NH |
|
|
dylan Phone #: ###-####
|
MEC18-05401
| Rough-in | 11/8/2018 | 11/9/2018 | 11/9/2018 10:14:15 AM | A | PASS |
|
|
Permission to cover Phone #: ###-#### Inspection requested via web by Angie Thome - R/I three exhaust fans ok- please add two more exhaust fans to list of fixtures- Ductless split lineset and condensate line will be ran exposed before final and will be checked at final-
|
MEC18-05387
| Pressure Test | 11/8/2018 | 11/9/2018 | 11/9/2018 9:58:10 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb and 5lb pressure test ok
|
MEC18-05387
| Rough-in | 11/8/2018 | 11/9/2018 | 11/9/2018 9:57:17 AM | A | PASS |
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak - fireplace and mec R/I ok
|
MEC17-01544
| Final | 11/9/2018 | 11/9/2018 | 11/9/2018 9:46:37 AM | A | PASS |
|
|
A Final inspection for rooms that were recently inspected for rough-in. Thanks, Doyle is still the contact their at Heatherwood retirement. However, He will will arrive by 9am Phone #: ###-#### Inspection requested via web by Brian Preece final ok
|
MEC18-03811
| Final | 11/8/2018 | 11/9/2018 | 11/9/2018 8:59:24 AM | A | PART |
|
|
duct blast witness 8am, 105,106,205,206,305,306 thanks Phone #: ###-#### Inspection requested via web by Gary Reeves- 05 06 ductblast ok- final ok- temp occ on 05 06 ok
|
MEC18-01885
| Final | 11/8/2018 | 11/9/2018 | 11/9/2018 8:13:31 AM | A | PASS |
|
|
Ken Palmer ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- range vent correction ok- final ok
|
MEC18-05229
| Rough-in | 11/8/2018 | 11/9/2018 | 11/9/2018 8:06:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero- fireplace R/I ok
|
MEC18-00668
| Mec-Aging Inspection | 11/9/2018 | 11/9/2018 | 11/9/2018 8:05:41 AM | | FAIL |
|
|
no inspection scheduled
|