PLM95-01713
| INSP - Plumbing Rough-in | 12/1/1995 | 12/1/1995 | 12/1/1995 12:00:00 AM | P | FAIL |
|
|
gave correction notice to forman on the job, Hank Reader. Corections: 1. Repipe (4) floor drains with individual vents up through floor. (They were tied together below floor) and 2. replace 2" waste with 3" where fixture units exceed 8 FU's. this is on the line going to the grease trap. Commercial floor sinks are 3 FU'S.
|
PLM95-01844
| INSP - Plumbing Rough-in | 12/1/1995 | 12/1/1995 | 12/1/1995 12:00:00 AM | P | PASS |
|
|
4 W/C 4 BASIN 4 TUB 2 SINK 2 W/B 2 W/H AND ONE HAS A BAR SINK NOT SURE WHICH ONE SORRY DUPLEX: r/i ok, Lee
|
PLM95-01849
| INSP - Plumbing Rough-in | 12/1/1995 | 12/1/1995 | 12/1/1995 12:00:00 AM | P | PASS |
|
|
9TH FLOOR UNIT 902 LATE PM SAME FIXTURES FOR SUITE 903 : waste and vent r/i and test ok
|
PLM4041708
| INSP - Plumbing Rough-in | 12/1/1995 | 12/1/1995 | 12/19/1905 12:00:00 AM | P | PART |
|
|
CORE ROOF DRAIN 5-8-not witnessed, will call back in FLOOR 5-10 WASTE AND VENTS-ok partial, one test(waste and vent)ok
|