Inspections for the day of: Tuesday, December 1, 1998.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD98-02953 INSP - Foundation12/1/199812/1/199812/10/1998 12:00:00 AMPFAIL
HAROLD ###-#### unable to contact...
MEC98-02872 INSP - Final11/30/199812/1/199812/1/1998 12:00:00 AMAFAIL
SABRINA ###-####...NO ACCESS...$42 FEE DUE
MEC98-02872 INSP - Final11/30/199812/1/199812/1/1998 12:00:00 AMAFAIL
SABRINA ###-####...NO ACCESS...$42 FEE DUE
MEC98-03058 INSP - Final11/30/199812/1/199812/1/1998 12:00:00 AMANR
KEY ABOVE FRONT DOORS...LARS ###-####;338 AREA? UNABLE TO CONTACT.
MEC98-03058 INSP - Final11/30/199812/1/199812/1/1998 12:00:00 AMANR
KEY ABOVE FRONT DOORS...LARS ###-####;338 AREA? UNABLE TO CONTACT.
MEC98-04058 INSP - Final11/30/199812/1/199812/1/1998 12:00:00 AMAPART
DUCTWORK ONLY ON PERMIT...SABRINA ###-#### ok
MEC98-04058 INSP - Final11/30/199812/1/199812/1/1998 12:00:00 AMAPART
DUCTWORK ONLY ON PERMIT...SABRINA ###-#### ok
MEC98-04064 INSP - Framing/ Rough-in11/30/199812/1/199812/1/1998 12:00:00 AMAFAIL
HOUSE MOVE...SABRINA ###-#### 338 area, c/n to verify venting for horiz. furnace ( underfloor ) vented into existing chimney as I am unable to determine connection . gas test ok
BLD95-01006 INSP - Final12/1/199812/1/199812/1/1998 12:00:00 AMPFAIL
conf w/ achd; appears to be different occupant at site but still a drive-thru coffee shop. Awaiting ACHD RESPONSE.
BLD98-02012 INSP - Final12/1/199812/1/199812/1/1998 12:00:00 AMPFAIL
need P&Z ok, install temp glass & all signage (exit, accessible, etc.) OK for T/O, card to contractor.
BLD98-02277 INSP - Foundation12/1/199812/1/199812/1/1998 12:00:00 AMPPART
econo lube; pending spec insp reports, told concrete contractor to have city plans onsite for insp's