Inspections for the day of: Wednesday, December 1, 1999.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-03395 BLD-Foundation11/30/199912/1/199912/1/1999 12:00:00 AMAPASS
wall insp---jake ###-#### ext 17145 mobile # Done on 11/30/99.
BLD99-02589 BLD-Framing/Rough-in11/30/199912/1/199912/1/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/30/1999 at 16:24:18. Contact: . Still has correctioins with new engineering.
BLD99-02589 BLD-Wall cover11/30/199912/1/199912/1/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/30/1999 at 16:24:44. Contact: . Still has corrections.
BLD99-02603 BLD-Framing/Rough-in11/30/199912/1/199912/1/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/30/1999 at 16:25:31. Contact: .
BLD99-02603 BLD-Wall cover11/30/199912/1/199912/1/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/30/1999 at 16:26:03. Contact: .
BLD99-01841 BLD-Framing/Rough-in12/1/199912/1/199912/1/1999 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/01/1999 at 08:05:46. Contact: ###-####. Shear nailing ok, need floor to floor St. straps.
BLD99-03446 BLD-Footing12/1/199912/1/199912/1/1999 12:00:00 AMPPASS
eric ###-#### or ###-#### ft insp
BLD99-03450 BLD-Footing12/1/199912/1/199912/1/1999 12:00:00 AMPPASS
JAY ###-####
BLD99-03444 BLD-Foundation12/1/199912/1/199912/1/1999 12:00:00 AMPPASS
FOUNDATION WALL JAY ###-####
BLD99-03321 BLD-Framing/Rough-in12/1/199912/1/199912/1/1999 12:00:00 AMPFAIL
tom--- ###-####
BLD99-02639 BLD-Wall cover12/1/199912/1/199912/1/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/01/1999 at 10:54:00. Contact: ###-####.