BLD00-01261
| BLD-Framing/Rough-in | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 12:01:23. Contact: ###-####. south wall sheathing missing top roof line screw atchment/ stud atchment at 4x4 steel colum. only south wall insp./missing top channal to wood plate 2@ 12 oc # 10 screws. 12/1/2000 9:27:00 AM
|
BLD00-01783
| BLD-Footing | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD99-01725
| BLD-Energy code compliance | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 17:13:50. Contact: ###-####. pending first floor. 12/1/2000 3:46:08 PM
|
BLD99-01722
| BLD-Final | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 17:14:57. Contact: ###-####.
|
BLD99-01716
| BLD-Final | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 17:16:12. Contact: ###-####.
|
BLD99-01723
| BLD-Final | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 17:17:19. Contact: ###-####.
|
BLD99-01729
| BLD-Final | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 17:18:24. Contact: ###-####.
|
BLD99-01712
| BLD-Final | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 17:19:30. Contact: ###-####.
|
BLD00-02398
| BLD-Framing/Rough-in | 12/1/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD99-02185
| BLD-Framing/Rough-in | 12/1/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/01/2000 at 09:42:28. Contact: ###-####. north corridor ok for cover plm acess door must be rated check at later date. 12/1/2000 2:29:56 PM
|
BLD00-01476
| BLD-Final | 12/1/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PART |
|
|
Added by Inspector: 301 On 12/1/2000 4:12:03 PM temp ok pending ele perm sign off.
|
BLD00-01563
| BLD-Concrete | 11/29/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 06:36:15. Contact: ###-####. placed with special insp. pending report. 12/1/2000 1:08:38 PM
|