BLD00-02908
| BLD-Framing/Rough-in | 11/29/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 13:21:47. Contact: ###-####.
c/n posted, ok to insulate unaffected areas 12/1/2000 10:33:56 AM
|
BLD00-02908
| BLD-Energy code compliance | 11/29/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 13:22:28. Contact: ###-####.
energy seal ok 12/1/2000 10:35:44 AM
|
BLD00-02168
| BLD-Final | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | A | FAIL |
|
|
FN --MIKE-- ###-####
c/n posted 12/1/2000 11:50:59 AM
|
BLD00-02473
| BLD-Footing | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | A | PART |
|
|
###-####
wip, ok w/ verbal corrections 12/1/2000 11:09:34 AM
|
MEC00-04172
| Rough-in | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC00-04172
| Pressure Test | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | A | PASS |
|
|
low side --25 psi ok 12/1/2000 10:37:09 AM
|
BLD00-03389
| BLD-Foundation | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | A | PART |
|
|
###-####
wip 12/1/2000 10:51:33 AM
|
BLD00-02370
| BLD-Final | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 16:31:28. Contact: ###-####.
c of c #18931 issued 12/1/2000 1:26:02 PM
|
BLD00-02460
| BLD-Framing/Rough-in | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PART |
|
|
nailing Bill ###-####
exterior shear ok 12/1/2000 12:37:30 PM
|
BLD00-01483
| BLD-Footing | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | CANC |
|
|
Chris ###-####
|
BLD00-02368
| BLD-Framing/Rough-in | 11/30/2000 | 12/1/2000 | 12/1/2000 12:00:00 AM | P | PART |
|
|
FR INSP- DOUG-- ###-####
need letter from architect on wall assembly not per plan, also using wood in door jambs.
the change in plans are ok as per t.y. and j.b. on change of office areas.
ok to cover int. walls if arch. submits letter or revised drawing. 12/1/2000 3:37:54 PM
|