FIR04-00577
| INSP-Sprinkler Rough-in/Hydro | 11/30/2004 | 12/1/2004 | 12/1/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/30/2004 at 12:08:34 PM. Contact: ###-####.
|
MIS04-00080
| FIR-Final | 12/1/2004 | 12/1/2004 | 12/1/2004 12:00:00 AM | A | PASS |
|
|
Fire final okay 12/1/2004 11:30:29 AM
|
FIR04-00663
| INSP-Sprinkler Rough-in/Hydro | 11/30/2004 | 12/1/2004 | 12/1/2004 12:00:00 AM | P | FAIL |
|
|
Contact: James Darr - Would like around 1:30 PM, please call to confirm. Thanks; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Phased project for phase I only; there are three heads off one inch in several areas - provide calcs or modify piping; phase one is marked on plans and it is installed per plans so okay to cover providing calcs prove plan piping 12/1/2004 11:33:44 AM
|
FIR04-00513
| INSP-Final Inspection | 11/30/2004 | 12/1/2004 | 12/1/2004 12:00:00 AM | P | PASS |
|
|
Cell Ph. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
|
FIR04-00576
| INSP-Alarm Testing | 11/30/2004 | 12/1/2004 | 12/1/2004 12:00:00 AM | P | PASS |
|
|
Cell Ph. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino Exsisting flow switch was used so the addresses were changed 12/1/2004 2:35:05 PM
|
BLD04-02423
| FIRE-Final Inspection | 12/1/2004 | 12/1/2004 | 12/1/2004 12:00:00 AM | P | PASS |
|
|
Bill; Phone #: ###-#### Internet Inspection Request from: Jan Rice The door at the second exit from the mezzanine that leads to lobby was removed instead of changing the swing to the path of egress - called Carl W. (PDS plan review) and he has approved this change; fire/life safety final okay 12/1/2004 3:33:43 PM
|
FIR04-00394
| INSP-Sprinkler Rough-in/Hydro | 12/1/2004 | 12/1/2004 | 12/1/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/1/2004 at 10:25:37 AM. Contact: ###-####. Sprinkler heads at soffit need to comply with Table 8.6.5.1.2 and remain no more than 12 inches from ceiling 12/1/2004 3:17:07 PM
|