FIR06-00596
| INSP-Final Inspection | 11/30/2006 | 12/1/2006 | 12/1/2006 4:39:22 PM | P | DEFR |
|
|
Per phone call from contractor, inspection rescheduled for 12/4.
|
FIR06-00548
| INSP-Sprinkler Rough-in | 11/30/2006 | 12/1/2006 | 12/1/2006 4:38:30 PM | P | PART |
|
|
Inspection for cover at the drop ceilings in the tanning booth rooms, mens locker and womens locker- one head in the laundry room is overspaced off an adjacent wall, one head in the mens locker west side is overspaced, painted heads in the womens locker room to be replaced as discussed, remainder of ceilings in these areas inspected today are okay for cover.
|
FIR06-00856
| INSP-Final Inspection | 11/30/2006 | 12/1/2006 | 12/1/2006 4:27:42 PM | P | PASS |
|
|
Fire alarm work is acceptable, inspection passed.
|
FIR06-00560
| INSP-Final Inspection | 12/1/2006 | 12/1/2006 | 12/1/2006 4:26:59 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR06-00581
| INSP-Final Inspection | 11/29/2006 | 12/1/2006 | 12/1/2006 4:24:53 PM | P | PASS |
|
|
Fire alarm work passed field inspection.
|
FIR06-00897
| INSP-Sprinkler Rough-in | 12/1/2006 | 12/1/2006 | 12/1/2006 4:24:15 PM | P | PART |
|
|
UG fire supply line installation appears acceptable for cover, no approved plans on site for verification of size (4") or routing.
|
BLD06-03000
| FIRE-Final Inspection | 11/30/2006 | 12/1/2006 | 12/1/2006 1:53:20 PM | A | FAIL |
|
|
Fire alarm modifications have been completed within this TI prior to issuance of an alarm permit. The fire alarm work will require a permit, inspection, and approval prior to request for a life safety final.
|
FIR06-00571
| INSP-Final Inspection | 11/30/2006 | 12/1/2006 | 12/1/2006 1:50:15 PM | A | PASS |
|
|
Fire alarm work inspection passed, permit finaled.
|