Inspections for the day of: Friday, December 1, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC06-03454 Rough-in11/30/200612/1/200612/1/2006 7:01:29 PMPPASS
kelly; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles...bill checked the clearance around bw bent and approved the r/i
MEC05-02888 Rough-in11/30/200612/1/200612/1/2006 6:59:32 PMPFAIL
Please call Tom 30 min before going out if possible. Thank you!!; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt..need disconnect at furnace in equipment room outside..need to insulate all the metal in unconditioned space (you cant just cover it with tape). need a secondary drain at outside furnace as sub-floor extends into the house. gas flex connector at furn need to be a 1/2" i.d...spoke with home-owner about moving the access opening to the attic furnace, move the light fixture, insulate all metal in attic. flex duct laying over some studs which has cut off the air flow. all other corrections posted in new addition..dixie
MEC06-03223 Rough-in12/1/200612/1/200612/1/2006 6:52:35 PMPFAIL
andrea ###-####..by moving the f/p forward to get the clearance in the back, you lost the clearance needed in the front..talked to andrea..reinspection fee
MEC06-03223 Conference11/30/200612/1/200612/1/2006 6:49:12 PMAPASS
Dixie, the builder says this is ready again. ###-####-is their # if we need to call them. Jenny Bryant. Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek..this should have been a r/i..i rescheduled it for you..dixie
MEC06-02184 Pressure Test12/1/200612/1/200612/1/2006 2:56:47 PMAPASS
hi dixie this was a 2lb system we all went over we just need a tag so they can get a meter set. thank you travis; Phone #: ###-#### Internet Inspection Request from: Becky Sucher....called int gas
MEC06-03722 Final12/1/200612/1/200612/1/2006 1:14:52 PMPPASS
MEC06-03722 Rough-in11/30/200612/1/200612/1/2006 1:12:14 PMAPASS
please do a rough in and final inspection. Dixie spoke with Kevin about this job and it should pass from their conversation. Thank you! Karen ; Phone #: ###-#### Internet Inspection Request from: Rick Lake
MEC06-02373 Final12/1/200612/1/200612/1/2006 1:10:16 PMPPASS
FP IS TRIMMED OUT NOW DIXIE, SORRY! Internet Inspection Request from: Shelley Baisch
MEC06-03868 Rough-in12/1/200612/1/200612/1/2006 1:08:34 PMPPASS
Scheduled by a contractor via Hello! on 12/1/2006 at 9:41:28 AM. Contact: ###-####....ok to cover
MEC06-03998 Pressure Test11/30/200612/1/200612/1/2006 1:08:03 PMANR
linda; Phone #: ###-#### 111 Internet Inspection Request from: Cathy Chiles...monte will check all guages before recall
MEC06-03998 Rough-in11/30/200612/1/200612/1/2006 1:06:57 PMAFAIL
linda; Phone #: ###-#### 111 Internet Inspection Request from: Cathy Chiles..posted corrections..talked to monte
MEC06-03606 Rough-in11/30/200612/1/200612/1/2006 1:01:07 PMAPASS
call Me to let Monte know you ar on your way; Phone #: ###-#### x111 Internet Inspection Request from: LINDA DORN...r/i and gas ok