Inspections for the day of: Tuesday, December 1, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00518 INSP-Conference12/1/200912/1/200912/1/2009 3:02:48 PMPDONE
Jerry MCAddams and I met with the builder and discussed the requirements for protection of the wet sprinkler system piping. He agreed to perform the work. We also discussed the lfie safety items related to th associated building permit including the fire alarm requirements..
BLD09-02053 FIRE-Final Inspection12/1/200912/1/200912/1/2009 2:52:10 PMPPASS
Life safety passed.
FIR09-00448 INSP-Sprinkler Rough-in/Hydro12/1/200912/1/200912/1/2009 2:11:16 PMPPASS
THe above ground hydro tests passed for both of the overhead systems.
FIR09-00419 INSP-Sprinkler Rough-in/Hydro12/1/200912/1/200912/1/2009 1:29:00 PMPPASS
Underground hydro test passed.
BLD09-02082 FIRE-Final Inspection12/1/200912/1/200912/1/2009 1:26:54 PMPFAIL
Fire sprinkler modifications are required due to sprinkler pendants located too close to one another. All other items appear to be ok.
BLD06-02723 FIRE-Final Inspection11/30/200912/1/200912/1/2009 12:31:06 PMAPASS
Life safety passed.
FIR09-00661 INSP-Final Inspection11/30/200912/1/200912/1/2009 12:19:51 PMAFAIL
Per the approved plans the maximum head spacing as hydraulically calculated is 112 sq. ft. As installed in the field the pendant heads are spaced up to 126 sq. ft. and in some locations the pendant even exceed 15'-0" apart.. I spoke with John at Commercial FIre and with Tim Frost in the office about this issue.
FIR09-00468 INSP-Final Inspection11/30/200912/1/200912/1/2009 11:34:24 AMAPASS
Permit finaled.
FIR09-00408 INSP-Final Inspection11/30/200912/1/200912/1/2009 10:30:34 AMAPASS
Permit finaled
FIR09-00672 INSP-Final Inspection11/30/200912/1/200912/1/2009 7:20:15 AMAPASS
Permit finaled