FIR14-00735
| INSP-Sprinkler Rough-in | 11/24/2014 | 11/25/2014 | | A | |
|
|
RTC for Dry System, Bldg D 1st floor, please call Scott 30 minutes prior at ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt
|
FIR14-00708
| INSP-Sprinkler Rough-in | 11/26/2014 | 11/26/2014 | | P | |
|
|
Matt Phone #: ###-####
|
FIR14-00531
| INSP-Conference | 11/26/2014 | 11/26/2014 | | P | |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR14-00735
| INSP-Sprinkler Rough-in | 11/26/2014 | 12/1/2014 | 12/9/2014 3:09:32 PM | P | PART |
|
|
|
FIR14-00460
| INSP-Sprinkler Rough-in | 12/1/2014 | 12/1/2014 | 12/3/2014 7:29:13 AM | P | PART |
|
|
Verified approved plans on site. Completed inspection for the first and second floor levels. Noted three areas in need of tenting adjustments, pendent head at the master bedroom closet needs relocated, three branchlines at the great room are not yet installed (no cover until inspected), minor field modifications at the first floor to branchline routing okayed, noted heads at the first floor office are not installed in the coffered ceiling members per plan- contractor to ensure obstruction criteria are met. Partial approval only. Basement level not yet finished for inspection.
|
BLD14-01034
| FIRE-Final Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 3:30:22 PM | P | PASS |
|
|
Life safety inspection passed.
|
FIR14-00828
| INSP-Final Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 3:16:58 PM | P | CANC |
|
|
Call prior to going Phone #: 2089411846 >> Inspection requested via mobile web by Brian A Inspection cancelled via mobile web on Monday, December 01, 2014.
|
BLD14-02970
| FIRE-Final Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 3:03:42 PM | P | PASS |
|
|
Life safety passed provided "door to remain...." signage is posted at the main entry/exit.
|
FIR14-00787
| INSP-Final Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 2:28:18 PM | P | PASS |
|
|
New SD's and occupant notification related to the tenant remodel and per scope of work passed inspection and testing. Caps at SD during construction and non-functional door mags at the elevator lobby to be removed prior to BLD final/occupancy approval. Fire alarm permit finaled.
|
BLD14-02934
| FIRE-Final Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 2:23:12 PM | P | PASS |
|
|
Fire life safety inspection completed satisfactory. Missing doors and hardware at individual offices to be installed prior to structural final for verification at that time.
|
FIR14-00732
| INSP-Final Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 2:21:05 PM | P | PASS |
|
|
Fire sprinkler work passed final walkthrough. Permit finaled.
|
FIR14-00855
| INSP-Final Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 2:19:54 PM | P | PASS |
|
|
Fire alarm testing completed acceptable. Permit finaled.
|
FIR14-00844
| INSP-Sprinkler Rough-in | 12/1/2014 | 12/1/2014 | 12/1/2014 11:53:50 AM | P | PART |
|
|
Overhead work at the remodel areas okayed for ceiling cover. Coverage at the storage room adjusted while on site to meet OH spacing.
|
BLD14-03376
| FIRE-Final Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 10:54:42 AM | A | PASS |
|
|
Verified noted corrections. Fire life safety finaled.
|
FIR14-00662
| INSP-Final Inspection | 11/26/2014 | 12/1/2014 | 12/1/2014 10:35:57 AM | A | PASS |
|
|
Scope of fire sprinkler work completed and passed final inspection.
|