BLD15-03965
| BLD-Footing | 11/30/2015 | 12/1/2015 | 12/1/2015 3:24:19 PM | P | NR |
|
|
Dane Phone #: ###-####
|
BLD15-03950
| BLD-Footing | 11/30/2015 | 12/1/2015 | 12/1/2015 3:23:58 PM | P | NR |
|
|
Dane Phone #: ###-####
|
BLD15-03328
| BLD-Ceiling Grid Inspection | 12/1/2015 | 12/1/2015 | 12/1/2015 2:36:36 PM | P | PASS |
|
|
Ted Phone #: ###-####
|
BLD15-02730
| BLD-Conference | 12/1/2015 | 12/1/2015 | 12/1/2015 2:19:04 PM | P | CANC |
|
|
Phone #: 7942509 >> Inspection requested via mobile web by Clayn
|
BLD15-02730
| BLD-Framing/Rough-in | 12/1/2015 | 12/1/2015 | 12/1/2015 2:18:40 PM | P | PASS |
|
|
Phone #: 7942509 >> Inspection requested via mobile web by Clayn. upeer and lower roof framing. Will also get RFI for relocating the upper straps.
|
BLD15-03161
| BLD-Energy code compliance | 11/30/2015 | 12/1/2015 | 12/1/2015 1:17:18 PM | P | PASS |
|
|
Joe Phone #: ###-####
|
BLD15-03161
| BLD-Framing/Rough-in | 11/30/2015 | 12/1/2015 | 12/1/2015 1:16:52 PM | P | PASS |
|
|
Joe Phone #: ###-####
|
BLD13-03602
| BLD-Final | 12/1/2015 | 12/1/2015 | 12/1/2015 1:12:05 PM | P | NR |
|
|
Please enter through east door, south of the mailboxes. Call ###-#### if you have any problems. Phone #: ###-#### Inspection requested via web by Tyler Hildebrand. Needs fire/life/safety final first.
|
BLD15-02025
| BLD-Framing/Rough-in | 11/30/2015 | 12/1/2015 | 12/1/2015 9:40:17 AM | A | PASS |
|
|
Matt Phone #: ###-####. Interior steel stud framed walls.
|
BLD15-00246
| BLD-Framing/Rough-in | 11/30/2015 | 12/1/2015 | 12/1/2015 9:03:35 AM | A | FAIL |
|
|
Pat Phone #: ###-####. Provide fire treated ply at laydown parapet. Bathroom ducts shall be in wall or provide dampers.
|