Inspections for the day of: Tuesday, December 1, 2015.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00180 General Inspection12/1/201512/1/201512/2/2015 4:18:47 PM PART
Site is mostly stabilized minus the hotel building footprint. Vertical construction and framing are in progress.

Verbal correction to RP Bob to have street sweeper on Pasadena now that trenching and landscaping are complete. Significant amount of loose dirt in roadway and gutter.

Reqeusted that sweeping be conducted Thursday or Friday. Will check back early next week. See also ESC-00822.
ESC14-00892 Site Final11/24/201512/1/201512/2/2015 3:47:32 PMAPASS
Work complete. No temp BMPs installed in MS4 on Malad. No remaining unstabilized area. Dumpsters and materials removed. All ESC permits finaled for townhome subdivision except ESC15-00267 to remove yellow signs, sweep interior road/gutter, and remove inlet bag.

No further ESC inspections on this permit.
ESC15-00858 General Inspection12/1/201512/1/201512/2/2015 11:23:27 AMPFAIL
No sediment control BMPs or housekeeping occuring at site.

Correction:
- install sediment filter bag on drop inlet in front of home.
- sweep up all loose sediment and trackout on Locust and Peirce
ESC15-01412 Site Preparation12/1/201512/1/201512/1/2015 1:36:11 PMPPASS
Brett Phone #: ###-####

Peppermill BMPs in place for CBH construction of new SFH. RP on duty. Approved for excavation.
ESC14-01040 General Inspection11/27/201512/1/201512/1/2015 1:01:17 PMACANC
ESC14-01052 General Inspection12/1/201512/1/201512/1/2015 1:01:06 PM CANC
ESC14-00886 Site Preparation11/25/201512/1/201512/1/2015 12:51:23 PMACANC
ESC14-01063 General Inspection12/1/201512/1/201512/1/2015 12:50:17 PM PASS
SFHs in progress. No hillside erosion rills or gullies observed. No sediment runoff or other discharges occuring. Minimal earth work occurring currently. No corrections at this time.
ESC15-01128 General Inspection12/1/201512/1/201512/1/2015 11:52:49 AMPPASS
WIP. Frame is up. No earthwork occuring at time of construction and existing vegetation was preserved as much as possible. No trackout or other issues at site, no corrections.
ESC15-00736 DOC - Permit Finaled12/1/201512/1/201512/1/2015 11:51:22 AMPDONE
Old home demolition complete. New SFH in progress. No violations at site. ESC permit finaled, remaining construction covered under ESC15-01128.
ESC15-00475 Aging Inspection12/1/201512/1/201512/1/2015 11:49:24 AM PASS
WIP on SFH. Outbuilding relocation is complete and attached to new foundation. All remaining ESC inspections at this site will be completed under ESC15-01128
ESC15-00475 DOC - Permit Finaled12/1/201512/1/201512/1/2015 11:48:03 AMPPASS
ESC15-00957 General Inspection12/1/201512/1/201512/1/2015 11:27:54 AMPPASS
Belmar roads and stormwater infrastructure is now complete. All new DIs have been fitted with sediment filter bags. No trackout from subdivision to Pierce Park. Perimeter to the south in general direction of slight slope is well vegetated with no surface waters in the area.

WIP on landscaping, subdivision fencing and some utility trenching for parcels.
ESC15-00504 General Inspection12/1/201512/1/201512/1/2015 11:15:24 AMPPASS
Two new large angular rock construction entrances installed as requested last week. Stormdrain inlet on south side of Saxton has been blocked by sandbags

Site is to sweep Wednesday or Thursday before warmer/wet weather forecasted arrives this weekend and next week. No corrections at this time.
ESC15-00893 General Inspection11/25/201512/1/201512/1/2015 11:00:58 AMPPEND
Follow up inspection for North Pointe Retail...

No significant trackout from site and no discharges from site.

Site still needs to conduct sweeping on State Street and remove the temporary ramp over the curb to job trailer.

Streets have still not been able to be paved...
ESC15-00425 General Inspection12/1/201512/1/201512/1/2015 10:57:38 AM PASS
Approved. See ESC15-00504 for main Kensington permit. New construction entrances installed with angular rock.
ESC14-01149 Aging Inspection12/1/201512/1/201512/1/2015 9:36:01 AM PASS
ESC15-00339 General Inspection12/1/201512/1/201512/1/2015 9:08:19 AM PASS
WIP. Site grading and utility connection work is complete. No vertical construction or paving yet. Access to site is off Gage Street and is restricted on Orchard.

No trackout or discharges coming from site observed. Approved.
ESC15-00412 General Inspection12/1/201512/1/201512/1/2015 8:49:15 AM PASS