PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, December 1, 2015
.
Number of inspections:
19
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC15-00180
General Inspection
12/1/2015
12/1/2015
12/2/2015 4:18:47 PM
PART
Site is mostly stabilized minus the hotel building footprint. Vertical construction and framing are in progress.
Verbal correction to RP Bob to have street sweeper on Pasadena now that trenching and landscaping are complete. Significant amount of loose dirt in roadway and gutter.
Reqeusted that sweeping be conducted Thursday or Friday. Will check back early next week. See also ESC-00822.
ESC14-00892
Site Final
11/24/2015
12/1/2015
12/2/2015 3:47:32 PM
A
PASS
Work complete. No temp BMPs installed in MS4 on Malad. No remaining unstabilized area. Dumpsters and materials removed. All ESC permits finaled for townhome subdivision except ESC15-00267 to remove yellow signs, sweep interior road/gutter, and remove inlet bag.
No further ESC inspections on this permit.
ESC15-00858
General Inspection
12/1/2015
12/1/2015
12/2/2015 11:23:27 AM
P
FAIL
No sediment control BMPs or housekeeping occuring at site.
Correction:
- install sediment filter bag on drop inlet in front of home.
- sweep up all loose sediment and trackout on Locust and Peirce
ESC15-01412
Site Preparation
12/1/2015
12/1/2015
12/1/2015 1:36:11 PM
P
PASS
Brett Phone #: ###-####
Peppermill BMPs in place for CBH construction of new SFH. RP on duty. Approved for excavation.
ESC14-01040
General Inspection
11/27/2015
12/1/2015
12/1/2015 1:01:17 PM
A
CANC
ESC14-01052
General Inspection
12/1/2015
12/1/2015
12/1/2015 1:01:06 PM
CANC
ESC14-00886
Site Preparation
11/25/2015
12/1/2015
12/1/2015 12:51:23 PM
A
CANC
ESC14-01063
General Inspection
12/1/2015
12/1/2015
12/1/2015 12:50:17 PM
PASS
SFHs in progress. No hillside erosion rills or gullies observed. No sediment runoff or other discharges occuring. Minimal earth work occurring currently. No corrections at this time.
ESC15-01128
General Inspection
12/1/2015
12/1/2015
12/1/2015 11:52:49 AM
P
PASS
WIP. Frame is up. No earthwork occuring at time of construction and existing vegetation was preserved as much as possible. No trackout or other issues at site, no corrections.
ESC15-00736
DOC - Permit Finaled
12/1/2015
12/1/2015
12/1/2015 11:51:22 AM
P
DONE
Old home demolition complete. New SFH in progress. No violations at site. ESC permit finaled, remaining construction covered under ESC15-01128.
ESC15-00475
Aging Inspection
12/1/2015
12/1/2015
12/1/2015 11:49:24 AM
PASS
WIP on SFH. Outbuilding relocation is complete and attached to new foundation. All remaining ESC inspections at this site will be completed under ESC15-01128
ESC15-00475
DOC - Permit Finaled
12/1/2015
12/1/2015
12/1/2015 11:48:03 AM
P
PASS
ESC15-00957
General Inspection
12/1/2015
12/1/2015
12/1/2015 11:27:54 AM
P
PASS
Belmar roads and stormwater infrastructure is now complete. All new DIs have been fitted with sediment filter bags. No trackout from subdivision to Pierce Park. Perimeter to the south in general direction of slight slope is well vegetated with no surface waters in the area.
WIP on landscaping, subdivision fencing and some utility trenching for parcels.
ESC15-00504
General Inspection
12/1/2015
12/1/2015
12/1/2015 11:15:24 AM
P
PASS
Two new large angular rock construction entrances installed as requested last week. Stormdrain inlet on south side of Saxton has been blocked by sandbags
Site is to sweep Wednesday or Thursday before warmer/wet weather forecasted arrives this weekend and next week. No corrections at this time.
ESC15-00893
General Inspection
11/25/2015
12/1/2015
12/1/2015 11:00:58 AM
P
PEND
Follow up inspection for North Pointe Retail...
No significant trackout from site and no discharges from site.
Site still needs to conduct sweeping on State Street and remove the temporary ramp over the curb to job trailer.
Streets have still not been able to be paved...
ESC15-00425
General Inspection
12/1/2015
12/1/2015
12/1/2015 10:57:38 AM
PASS
Approved. See ESC15-00504 for main Kensington permit. New construction entrances installed with angular rock.
ESC14-01149
Aging Inspection
12/1/2015
12/1/2015
12/1/2015 9:36:01 AM
PASS
ESC15-00339
General Inspection
12/1/2015
12/1/2015
12/1/2015 9:08:19 AM
PASS
WIP. Site grading and utility connection work is complete. No vertical construction or paving yet. Access to site is off Gage Street and is restricted on Orchard.
No trackout or discharges coming from site observed. Approved.
ESC15-00412
General Inspection
12/1/2015
12/1/2015
12/1/2015 8:49:15 AM
PASS