Inspections for the day of: Friday, December 1, 2017.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00667 INSP-Final Inspection12/1/201712/1/201712/1/2017 3:01:07 PMPCANC
Chris or ###-#### Paula Phone #: ###-####
FIR17-00611 INSP-Final Inspection11/30/201712/1/201712/1/2017 2:00:19 PMPPASS
Permit finaled
FIR16-00821 INSP-Sprinkler Rough-in11/30/201712/1/201712/1/2017 1:44:24 PMPPASS
The piping above the lay-in ceilings in buildings 1 and 2 is ok for cover.

Mikael Phone #: ###-####
FIR17-00303 INSP-Sprinkler Rough-in11/30/201712/1/201712/1/2017 1:32:13 PMPPASS
Piping above the hard lids is ok for cover. I noted electrical boxes located close to the pendants that may pose an obstruction problem.
BLD17-04363 FIRE-Final Inspection11/30/201712/1/201712/1/2017 12:43:31 PMAFAIL
Need the ceiling tile re-installed or existing sprinkler system modified. Exit signs and emergency lights and fire extinguishers were functional

Russ Phone #: ###-####
FIR17-00571 INSP-Final Inspection11/30/201712/1/201712/1/2017 10:27:17 AMAPASS
Permit finaled

Dave Phone #: ###-####
FIR17-00690 INSP-Conference12/1/201712/1/201712/1/2017 9:11:46 AMADONE
Jeff and I spoke about the conditions for final sign offs for the shell and TI permits.
FIR17-00690 INSP-Sprinkler Rough-in12/1/201712/1/201712/1/2017 9:11:03 AMAPASS
Piping above the ceilings is ok for cover. Also Need all typical items for final, signs/stickers..ect and also need the pipe sizing to the heads under hvac units and doors addressed and heads changed out at the unit heaters.


wrong cell phone input my apologies. Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR17-00275 INSP-Sprinkler Rough-in12/1/201712/1/201712/1/2017 9:10:08 AMAPASS
Need all typical items for final, signs/stickers..ect and also need the pipe sizing to the heads under hvac units and doors addressed and heads changed out at the unit heaters.
FIR17-00545 INSP-Final Inspection11/30/201712/1/201712/1/2017 7:40:15 AMAFAIL
Not ready for a final yet but Corridor 199 and the Laundry Room sprinkler piping is ok to cover

Contact Brad Westbrook ###-#### 30 min prior to Fire Final insp Start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR17-00690 INSP-Sprinkler Rough-in11/30/201712/1/201712/1/2017 7:05:49 AMAFAIL
I left two voice messages for contact. I went to project site and made no contact. No inspection performed.

Please call Jeff when available. I will meet you first thing am. Thank you. Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR17-00680 INSP-Final Inspection11/28/201712/1/201712/1/2017 12:00:00 AMPCANC
Before 3 - Eric Phone #: ###-#### // 12/1/17 @ 8:15am cancelled per phone call from Crane Alarm//leg