BLD01-00539
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/17/2001 12:00:00 AM | | NR |
|
|
wip, 1st fl. west wing. 12/17/2001 3:05:17 PM
|
BLD00-02380
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/17/2001 12:00:00 AM | | NR |
|
|
community hse, will final w/ rest of project 12/17/2001 8:44:11 AM
|
BLD01-01596
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/12/2001 12:00:00 AM | | PASS |
|
|
ok 12/12/2001 11:40:02 AM
|
BLD01-00531
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/11/2001 12:00:00 AM | | NR |
|
|
wip 12/11/2001 9:58:37 AM
|
BLD00-03519
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/11/2001 12:00:00 AM | | NR |
|
|
wip 12/11/2001 9:58:32 AM
|
BLD01-02037
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/11/2001 12:00:00 AM | | NR |
|
|
homeowner, wip...exp 2-22-02 12/11/2001 11:53:36 AM
|
BLD01-00513
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/11/2001 12:00:00 AM | | NR |
|
|
no call by contractor....wip 12/11/2001 6:34:14 PM
|
BLD01-01297
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/11/2001 12:00:00 AM | | NR |
|
|
BUSD???wip? 12/11/2001 11:54:41 AM
|
BLD01-00370
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | | NR |
|
|
owner, wip 12/12/2001 3:55:09 PM
|
BLD01-01075
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | | NR |
|
|
wip 12/11/2001 11:55:16 AM
|
BLD01-01375
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | | NR |
|
|
wip 12/11/2001 11:52:11 AM
|
BLD01-00231
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | | NR |
|
|
will consult fire 12/11/2001 9:22:52 AM
|
BLD01-01597
| BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | | PASS |
|
|
ok 12/12/2001 11:31:23 AM
|
BLD01-02133
| BLD-Conference | 12/7/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/07/2001 at 11:59:59. Contact: ###-####.. misc.firestops at flutes & penetrations will be open for inspat final. 12/10/2001 12:20:41 PM
|
BLD01-00596
| BLD-Framing/Rough-in | 12/7/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/07/2001 at 14:25:36. Contact: ###-####....need hvac ok 3rd fl, complete air seal, etc. recall 12/10/2001 10:56:55 AM
|
BLD01-02775
| BLD-Framing/Rough-in | 12/7/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | A | FAIL |
|
|
###-####; need arch's clarification and struct framing details 12/10/2001 12:15:23 PM for tunnel, ok to 1 12/10/2001 12:15:43 PM
|
BLD01-00596
| BLD-Conference | 12/10/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 12/10/2001 9:42:21 AM previously rec'd eng'g for 1st floor shear walls...ok to continue. c/n ok.
|
BLD01-02149
| BLD-Conference | 12/10/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 12/10/2001 11:27:35 AM ok to insulate upper floor, owner has eng'g for beams as req'd.
|
BLD01-02264
| BLD-Framing/Rough-in | 12/10/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 11:14:28. Contact: ###-####. walls ok, chk spray on at exist beam, firestops at corridor at grid insp. 12/10/2001 5:02:36 PM
|
BLD01-02093
| BLD-Framing/Rough-in | 12/10/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 12/10/2001 5:03:42 PM grid, demising ok.
|
BLD01-02149
| BLD-Framing/Rough-in | 12/10/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 12/10/2001 5:35:52 PM eng'g ok, need complete hvac r/i; ok to insulate existing house due to cold weather. rest of c/n ok.
|
BLD98-03705
| BLD-Conference | 12/10/2001 | 12/10/2001 | 12/10/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 12/10/2001 5:52:04 PM w/ Jim Rogers re MTI soils report
|