Inspections for the day of: Wednesday, December 10, 2003.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC03-03534 Rough-in12/9/200312/10/200312/10/2003 12:00:00 AMAPART
###-#### Todd
no duct under floor and supply plenum through floor to furnace location. 12/10/2003 9:39:09 AM
MEC03-03534 Pressure Test12/9/200312/10/200312/10/2003 12:00:00 AMAPASS
###-#### Todd
MEC03-03474 Pressure Test12/9/200312/10/200312/10/2003 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: misty evans
MEC03-03474 Rough-in12/9/200312/10/200312/10/2003 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: misty evans
BLD03-02606 BLD-Framing/Rough-in12/9/200312/10/200312/10/2003 12:00:00 AMPFAIL
Pat; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
c/n posted ok to insulate 12/10/2003 2:09:40 PM
MEC03-03433 Pressure Test12/10/200312/10/200312/10/2003 12:00:00 AMPPASS
pressure gauge is on the bbq stub. general contractor is on sight. Jeff is point of contact ###-####; Phone #: ###-#### Internet Inspection Request from: Veronica England
BLD03-02395 BLD-Final12/10/200312/10/200312/10/2003 12:00:00 AMPDONE
jude-- ###-####
BLD03-01997 BLD-Final12/10/200312/10/200312/10/2003 12:00:00 AMPPASS
brian--call 1st before insp for access; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
MEC03-02945 Final12/10/200312/10/200312/10/2003 12:00:00 AMPPASS
BLD03-01571 BLD-Concrete12/10/200312/10/200312/10/2003 12:00:00 AMPPASS
Ok angle iron and vertical rebar at corner of building. Epoxy verified by special inspection. Ok to place concrete.
BLD03-01922 BLD-Final12/9/200312/10/200312/10/2003 12:00:00 AMPFAIL
bryan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
c/n posted, need insulation certificate 12/10/2003 2:42:03 PM