MEC03-03534
| Rough-in | 12/9/2003 | 12/10/2003 | 12/10/2003 12:00:00 AM | A | PART |
|
|
###-#### Todd
no duct under floor and supply plenum through floor to furnace location. 12/10/2003 9:39:09 AM
|
MEC03-03534
| Pressure Test | 12/9/2003 | 12/10/2003 | 12/10/2003 12:00:00 AM | A | PASS |
|
|
###-#### Todd
|
MEC03-03474
| Pressure Test | 12/9/2003 | 12/10/2003 | 12/10/2003 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans
|
MEC03-03474
| Rough-in | 12/9/2003 | 12/10/2003 | 12/10/2003 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans
|
BLD03-02606
| BLD-Framing/Rough-in | 12/9/2003 | 12/10/2003 | 12/10/2003 12:00:00 AM | P | FAIL |
|
|
Pat; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
c/n posted ok to insulate 12/10/2003 2:09:40 PM
|
MEC03-03433
| Pressure Test | 12/10/2003 | 12/10/2003 | 12/10/2003 12:00:00 AM | P | PASS |
|
|
pressure gauge is on the bbq stub. general contractor is on sight. Jeff is point of contact ###-####; Phone #: ###-#### Internet Inspection Request from: Veronica England
|
BLD03-02395
| BLD-Final | 12/10/2003 | 12/10/2003 | 12/10/2003 12:00:00 AM | P | DONE |
|
|
jude-- ###-####
|
BLD03-01997
| BLD-Final | 12/10/2003 | 12/10/2003 | 12/10/2003 12:00:00 AM | P | PASS |
|
|
brian--call 1st before insp for access; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
MEC03-02945
| Final | 12/10/2003 | 12/10/2003 | 12/10/2003 12:00:00 AM | P | PASS |
|
|
|
BLD03-01571
| BLD-Concrete | 12/10/2003 | 12/10/2003 | 12/10/2003 12:00:00 AM | P | PASS |
|
|
Ok angle iron and vertical rebar at corner of building. Epoxy verified by special inspection. Ok to place concrete.
|
BLD03-01922
| BLD-Final | 12/9/2003 | 12/10/2003 | 12/10/2003 12:00:00 AM | P | FAIL |
|
|
bryan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
c/n posted, need insulation certificate 12/10/2003 2:42:03 PM
|