Inspections for the day of: Friday, December 10, 2004.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-02548 FIRE-Alarm Testing12/9/200412/10/200412/10/2004 12:00:00 AMAPART
lawrence Note: Also fire sprinker & also please call 1/2 hr prior to inspections; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Will need the unit UL listed as a system before using 12/10/2004 11:53:43 AM
FIR03-00739 INSP-Final Inspection12/9/200412/10/200412/10/2004 12:00:00 AMAPASS
Burl; ###-#### AIC
FIR03-00741 INSP-Final Inspection12/9/200412/10/200412/10/2004 12:00:00 AMAPASS
Burl; ###-#### AIC
BLD04-02236 FIRE-Final Inspection12/9/200412/10/200412/10/2004 12:00:00 AMAPART
Fire/life safety on temp pending completion of fire alarm permit per Dave Miller approval 12/10/2004 1:24:11 PM
FIR04-00175 INSP-Final Inspection12/10/200412/10/200412/10/2004 12:00:00 AMAPASS
Final okay 12/10/2004 9:03:13 AM
BLD03-02191 FIRE-Final Inspection12/10/200412/10/200412/10/2004 12:00:00 AMAPASS
Final okay 12/10/2004 9:03:19 AM
FIR04-00214 INSP-Final Inspection12/10/200412/10/200412/10/2004 12:00:00 AMAPASS
BLD03-02288 FIRE-Final Inspection12/10/200412/10/200412/10/2004 12:00:00 AMAPASS
Fire/life safety okay 12/10/2004 9:06:45 AM
FIR04-00661 INSP-Final Inspection12/10/200412/10/200412/10/2004 12:00:00 AMPNR
Sam; Phone #: ###-#### Internet Inspection Request from: Jan Rice Alarm system not ready to test pre-action system 12/10/2004 2:58:57 PM
FIR04-00472 INSP-Final Inspection12/10/200412/10/200412/10/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/10/2004 at 8:34:37 AM.
BLD03-02187 FIRE-Conference12/8/200412/10/200412/10/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/8/2004 at 9:18:45 AM. Contact: ###-####. Met with GC - the exiting from the core restrooms will require occupants to exit without key through tenant spaces and the building is supposed to be fire sprinklered throughout the entire building - the architect is aware of both issues and is working on them 12/10/2004 2:51:53 PM
FIR04-00710 INSP-Alarm Testing12/9/200412/10/200412/10/2004 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 12/9/2004 at 7:46:27 AM. Contact: ###-####. Per contractor the inspection will have to be reschuled 12/10/2004 2:58:35 PM
FIR04-00593 INSP-Sprinkler Rough-in12/9/200412/10/200412/10/2004 12:00:00 AMPFAIL
mick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need resubmittals for UG work as it extends beyond both PIV's for future use; need tracer wire; show details for rod work at base of riser and ductile used from PIV to riser; depth of bury okay 12/10/2004 2:55:12 PM