ESC09-00352
| General Inspection | 12/10/2009 | 12/10/2009 | 12/10/2009 1:58:35 PM | P | PASS |
|
|
Project is frozen and snow covered. Appears ok. Walked river bank portion to reciew what excavation had occurred. Also, reviewed up coming demo of wood portion of the old pump intake building. Informed RP that work is recommended after the river flows are lowered and to block off the intake channel prior to starting. As well, attention to detail when removing the old piping equipment and pumps, they could contain residual oils which cannot be released to surface below. Think through containment prior to starting activities.
|