ESC09-00379
| Site Final | 11/13/2009 | 12/10/2009 | 12/10/2009 2:19:05 PM | A | CANC |
|
|
duplicate
|
ESC09-00379
| Site Final | 11/13/2009 | 12/10/2009 | 12/10/2009 2:18:53 PM | A | FAIL |
|
|
Verbal to RP: Must stabilize the field to the west where the spoils were spead out once a thaw occurs in the spring of 201o to achieve final stabilization of the disturbed area.
|
ESC09-00750
| Site Preparation | 12/10/2009 | 12/10/2009 | 12/10/2009 10:32:47 AM | | DONE |
|
|
completed already
|
ESC09-00756
| Site Preparation | 12/10/2009 | 12/10/2009 | 12/10/2009 10:08:17 AM | | PASS |
|
|
|
ESC09-00762
| Site Preparation ESC | 12/10/2009 | 12/10/2009 | 12/10/2009 8:55:49 AM | | FAIL |
|
|
Verbal to RP: Post ESC sign at front of job where visable from the street. If tracking starts to occur a stabilized construction exit will be expected. Will re-inspect on 12/15/09am.
|
ESC09-00766
| Site Preparation | 12/10/2009 | 12/10/2009 | 12/10/2009 8:32:24 AM | | NR |
|
|
|