FIR12-00680
| INSP-Final Inspection | 12/10/2012 | 12/10/2012 | 12/10/2012 3:40:41 PM | P | CANC |
|
|
Jeremy phone #: ###-####
|
BLD12-02257
| FIRE-Final Inspection | 12/10/2012 | 12/10/2012 | 12/10/2012 3:32:49 PM | P | FAIL |
|
|
Repair the exit signs and emergency lights as discussed and provide the additional exit sign at the door to the lobby as shown on the approved plans. Also the fire alarm panel is in a "trouble condition". Per phone call from Mark at Alarmco the panel will be repaired, if needed, by tomorrow and he will call me on status.
|
BLD12-03132
| FIRE-Final Inspection | 12/10/2012 | 12/10/2012 | 12/10/2012 2:52:16 PM | P | PASS |
|
|
Life safety passed
|
FIR12-00670
| INSP-Sprinkler Rough-in | 12/7/2012 | 12/10/2012 | 12/10/2012 2:32:20 PM | A | PART |
|
|
The underground supply line piping is ok to cover from the building to the blow off cap. The connection to United Water is not complete at this time due to bury depth. issues.
|
BLD12-01461
| FIRE-Conference | 12/7/2012 | 12/10/2012 | 12/10/2012 11:58:56 AM | A | DONE |
|
|
Dave Dixon, hvac contractor, electrician and I had a conference about Dave's need for a temporary occupancy. I let him know that all inspections (alarm, sprinkler, hood suppression, life safety) would need to be completed and then he would need to contact Scott Arellano to make a request.
|
BLD12-02782
| FIRE-Final Inspection | 12/7/2012 | 12/10/2012 | 12/10/2012 10:08:37 AM | A | PASS |
|
|
Life safety passed
|