BLD13-02929
| BLD-Wall Bracing | 12/9/2013 | 12/10/2013 | 12/10/2013 3:04:38 PM | P | FAIL |
|
|
cameron Phone #: ###-####. Install all missing blocking and restaple all lacking and missed areas.
|
ESC13-01071
| Random Inspection | 12/10/2013 | 12/10/2013 | 12/10/2013 3:03:27 PM | P | PASS |
|
|
|
BLD13-03375
| BLD-Footing | 12/10/2013 | 12/10/2013 | 12/10/2013 3:03:02 PM | P | NR |
|
|
Mike Phone #: ###-#### ok to build forms. Went over ACI 306 with contractor. Will add supplemental heat and cover footings over night. Will inspect tomorrow in late morning for possible placement in the pm. Will also need to maintain footing temps at min. 50 degrees F. for 3 days.
|
BLD13-02226
| BLD-Energy code compliance | 12/9/2013 | 12/10/2013 | 12/10/2013 10:41:11 AM | A | PASS |
|
|
Randy Phone #: ###-####
|
GCB13-00112
| GCB-Ceiling Grid | 12/9/2013 | 12/10/2013 | 12/10/2013 9:24:11 AM | A | PASS |
|
|
Ron ###-#### Please make sure framing inspection results are entered as well. Ron said framing inspect was already done.
|
GCB13-00112
| GCB-Framing | 12/10/2013 | 12/10/2013 | 12/10/2013 9:24:00 AM | A | PASS |
|
|
Ron ###-#### Please make sure framing inspection results are entered as well. Ron said framing inspect was already done. A framing inspection has been completed. They are listed under the footing inspections. (wrong inspection detail). Notes under these inspections do indicate framing was inspected.
|
GCB13-00112
| GCB-Final | 12/9/2013 | 12/10/2013 | 12/10/2013 9:21:59 AM | A | FAIL |
|
|
Ron ###-#### Make sure framing/and ceiling inspects are done and in system please. Provide panic hardware at rear exit, install exterior emergerncy lighting at front enterance, provide lock indicator at main enterance/exit. Also install the vertical grabbars in restrooms.
|