FIR14-00480
| INSP-Alarm Testing | 12/9/2014 | 12/10/2014 | 12/11/2014 2:55:51 PM | P | DONE |
|
|
Inspected/tested audio/visuals for the "industrial" portion of the building. Also did unit shut down. Need as-builts reflecting changes of a/v's from ceiling mount to wall mount and gererator power.
|
FIR14-00721
| INSP-Sprinkler Rough-in/Hydro | 12/10/2014 | 12/10/2014 | 12/11/2014 9:31:34 AM | P | PART |
|
|
The east building underground hydro failed. The west building underground hydro passed.
|
BLD14-02689
| FIRE-Final Inspection | 12/10/2014 | 12/10/2014 | 12/10/2014 3:23:59 PM | P | PART |
|
|
Life safety for phase 1 is passed.
|
BLD14-01339
| FIRE-Final Inspection | 12/9/2014 | 12/10/2014 | 12/10/2014 12:53:25 PM | A | PASS |
|
|
Life safety passed
|
FIR14-00609
| INSP-Final Inspection | 12/9/2014 | 12/10/2014 | 12/10/2014 12:53:04 PM | A | PASS |
|
|
Permit finaled
|
BLD14-01103
| FIRE-Final Inspection | 12/10/2014 | 12/10/2014 | 12/10/2014 8:59:57 AM | P | PASS |
|
|
life safety passed
|
BLD14-01104
| FIRE-Final Inspection | 12/10/2014 | 12/10/2014 | 12/10/2014 8:59:41 AM | P | PASS |
|
|
life safety passed
|
BLD14-01105
| FIRE-Final Inspection | 12/9/2014 | 12/10/2014 | 12/10/2014 8:59:18 AM | A | PASS |
|
|
life safety passed
|
BLD14-01106
| FIRE-Final Inspection | 12/9/2014 | 12/10/2014 | 12/10/2014 8:58:46 AM | A | PASS |
|
|
life safety passed
|
FIR14-00704
| INSP-Final Inspection | 12/8/2014 | 12/10/2014 | 12/10/2014 8:57:51 AM | A | PASS |
|
|
Permit finaled
|