Inspections for the day of: Wednesday, December 10, 2014.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00617 General Inspection12/10/201412/10/201412/10/2014 4:31:00 PM PART
Need to suppress stone cutting dust with cooling water or keep with containment tarps that are set up.

Permit is posted, no erosion or sediment trackout. WIP.
ESC14-00689 Random Inspection12/10/201412/10/201412/10/2014 4:01:37 PMPPASS
Zoo project in progress. Permits open, no violations or issues observed.
ESC14-00630 General Inspection12/10/201412/10/201412/10/2014 4:00:57 PM PASS
Zoo project in progress. BLD open. Permit posted on gate, no trackout or other violations observed. See also ESC14-00689
ESC14-01040 Random Inspection12/10/201412/10/201412/10/2014 3:57:38 PMPPART
Permit posted and perimeter wattles installed. No construction entrance or vehicle tracking pad. No site preparation inspection was requested or conducted. There is significant trackout to Shellie St.

Will follow up with contractor to clean up street and provide trackout BMP
ESC14-00331 Aging Inspection12/10/201412/10/201412/10/2014 3:25:29 PM PASS
Construction complete. Some landscaping is ongoing. Duplex is occupied and BLD finaled. No further ESC inspections required.
ESC14-00331 DOC - Permit Finaled12/10/201412/10/201412/10/2014 3:25:10 PMPPASS
ESC14-00143 Aging Inspection12/10/201412/10/201412/10/2014 3:15:56 PM PASS
Detached garage has been built. Finishing touches remain; driveway is not paved. BLD still open.

No corrections necessary.
ESC14-00181 Aging Inspection12/10/201412/10/201412/10/2014 2:59:00 PM PASS
Home is near completion. Landscaping and stabilization not yet acheived. No sediment or discharges leaving site. Perimeter wattle installed; permit posted.
ESC14-00608 General Inspection12/10/201412/10/201412/10/2014 2:43:43 PM PART
Work is ongoing. Some streets have been paved in development. The stormwater pond to the south of Warm Springs is being excavated. No trackout or discharges observed on Warm Springs.

Correction:

Sweep up trackout on Old Hickory from the west exit.

Overall site is in compliance, mainly due to limited activity in the past several weeks.
ESC14-01076 Site Preparation12/10/201412/10/201412/10/2014 2:31:03 PMPPASS
Clint Phone #: ###-####

Permit posted. Will need to clean and remove the lined washout pit on this parcel. Some minor trackout on the townhome road should be cleaned. Trash is contained; no trackout to Millet or discharges observed. Approved.
ESC13-00755 Complaint Inspection12/10/201412/10/201412/10/2014 2:14:19 PMPFAIL
Inpsection conducted at 1:00 pm

Observations:
-Trackout from employee parking area to the west of site (across Council Springs). Mud on employee cars is contributing to the dirty streets.
- Construction entrace on Lysted has caked in with mud, resulting in trackout.
- Sections of perimeter silt fence and construction fencing are damaged and need repair.
- Sediment and mud in gutters is not being picked up by the sweeper unit that is on site. Council Springs in particular.

Note: due to the vertical construction and large scale of the project there is a lot of heavy machinery, supplies, loading/unloading trucks, and workers within the site. Space for designated parking and storage is very limited and the mud hasn't been able to dry, creating a tough situation to manage. Interior can be muddy, but need to make sure that offsite trackout is controlled and prevent discharges of muddy water.

Corrections:
1. Continue sweeping all surrounding streets and the paved access road within site.
2. Restore construction entrance (Lysted & parking area)
3. Clean gutters on Council Springs
4. Repair damaged sections of silt fence and sweep alley in areas where dirt has migrated.

Site supervisor JC with Petra stated that sweeping has been occuring daily, he is restricting access to the east construction entrance when muddy, and they have been scraping the central access road occassionally.

Need to continue these efforts and have a specific crew address some of the problem areas mentioned above.
He did mention that all employee parking will soon be moved to the laydown yard.
ESC14-01027 Site Preparation12/9/201412/10/201412/10/2014 1:58:49 PMAPASS
Clint Phone #: ###-####

Permit posted. Site ready for excavation. Tahoe Homes in East Valley are in compliance.
ESC14-01082 Site Preparation12/10/201412/10/201412/10/2014 12:43:41 PMPPASS
Kelly Phone #: ###-####

Contractor to start tomorrow. Will provide inlet protection on storm drain. Post permit and clean up any trackout.
ESC12-00364 General Inspection12/10/201412/10/201412/10/2014 8:53:26 AM PASS