Inspections for the day of: Thursday, December 10, 2015.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-03235 BLD-Framing/Rough-in12/10/201512/10/201512/10/2015 4:31:14 PMPPASS
Brett Phone #: ###-####
MIS15-00230 BLD-Final12/10/201512/10/201512/10/2015 4:30:55 PMPDONE
Obtained Cert of Occupancy.
MIS15-00230 DOC - Permit Finaled12/10/201512/10/201512/10/2015 4:30:08 PMPPASS
BLD15-04223 BLD-Conference12/9/201512/10/201512/10/2015 4:29:34 PMPPASS
Phone #: ###-#### Inspection requested via web by Chris Howell
BLD15-04223 DOC - Permit Finaled12/10/201512/10/201512/10/2015 4:29:19 PMPPASS
BLD15-04110 BLD-Foundation12/9/201512/10/201512/10/2015 3:02:46 PMPPASS
Luke Phone #: ###-####
BLD15-04275 BLD-Framing/Rough-in12/10/201512/10/201512/10/2015 3:02:23 PMPPASS
Todd Phone #: ###-####
BLD15-03000 BLD-Energy code compliance12/10/201512/10/201512/10/2015 3:02:03 PMPPASS
Zack Phone #: ###-####
BLD15-03141 BLD-Final12/9/201512/10/201512/10/2015 3:01:41 PMPPASS
Kelly Phone #: ###-####
BLD15-04085 BLD-Footing12/10/201512/10/201512/10/2015 3:01:00 PMPPASS
Erin Phone #: ###-####
BLD15-01520 BLD-Footing12/10/201512/10/201512/10/2015 3:00:32 PMPNR
Matt Phone #: ###-####
Need approved plan with all small docs. Special inspection not done. Footing to the South does not match plans.....Engineer to advise. Provide Stamped engineering details if plans are modified.
BLD15-01520 BLD-Foundation12/10/201512/10/201512/10/2015 2:56:01 PMPCANC
Rebar // Matt Phone #: ###-####
BLD15-01521 BLD-Foundation12/10/201512/10/201512/10/2015 2:27:33 PMPNR
Rebar // Jamal Phone #: ###-####
Special insp. required.......No inspection performed. Footing pad to the North.....is not complete per plan......Foundation wall intersects footing and footing not big enough. Engineer to advise. Contractor to provide small docs which were not attached to plan.
BLD15-03428 BLD-Foundation12/9/201512/10/201512/10/2015 1:30:21 PMAPASS
Kenny Phone #: ###-####
BLD14-02949 BLD-Final12/9/201512/10/201512/10/2015 11:06:15 AMAPASS
Jason Phone #: ###-####
BLD14-02949 DOC - Permit Finaled12/10/201512/10/201512/10/2015 11:06:03 AMPPASS
BLD15-03520 BLD-Framing/Rough-in12/9/201512/10/201512/10/2015 10:54:05 AMAPASS
Charlie Phone #: ###-####
BLD15-03000 BLD-Framing/Rough-in12/9/201512/10/201512/10/2015 10:31:20 AMAPART
Zach Phone #: ###-####
Wall Framing OK.....Told Zach that if he does not install Ext. door in break room.......AND omits Changing Room to have PDS approve as plan modification. Engineer is working on Roof trusses and framing additions or changes. (underside of roof will stay exposed). He is to call for insp when roof is completed. Any Engineering for roof structural changes shall be submitted to PDS for approval. (may be Strengthening trusses). Need special insp. report for insp of Epoxy bolting at new CMU openings. OK to insulate.