BLD15-03235
| BLD-Framing/Rough-in | 12/10/2015 | 12/10/2015 | 12/10/2015 4:31:14 PM | P | PASS |
|
|
Brett Phone #: ###-####
|
MIS15-00230
| BLD-Final | 12/10/2015 | 12/10/2015 | 12/10/2015 4:30:55 PM | P | DONE |
|
|
Obtained Cert of Occupancy.
|
MIS15-00230
| DOC - Permit Finaled | 12/10/2015 | 12/10/2015 | 12/10/2015 4:30:08 PM | P | PASS |
|
|
|
BLD15-04223
| BLD-Conference | 12/9/2015 | 12/10/2015 | 12/10/2015 4:29:34 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Howell
|
BLD15-04223
| DOC - Permit Finaled | 12/10/2015 | 12/10/2015 | 12/10/2015 4:29:19 PM | P | PASS |
|
|
|
BLD15-04110
| BLD-Foundation | 12/9/2015 | 12/10/2015 | 12/10/2015 3:02:46 PM | P | PASS |
|
|
Luke Phone #: ###-####
|
BLD15-04275
| BLD-Framing/Rough-in | 12/10/2015 | 12/10/2015 | 12/10/2015 3:02:23 PM | P | PASS |
|
|
Todd Phone #: ###-####
|
BLD15-03000
| BLD-Energy code compliance | 12/10/2015 | 12/10/2015 | 12/10/2015 3:02:03 PM | P | PASS |
|
|
Zack Phone #: ###-####
|
BLD15-03141
| BLD-Final | 12/9/2015 | 12/10/2015 | 12/10/2015 3:01:41 PM | P | PASS |
|
|
Kelly Phone #: ###-####
|
BLD15-04085
| BLD-Footing | 12/10/2015 | 12/10/2015 | 12/10/2015 3:01:00 PM | P | PASS |
|
|
Erin Phone #: ###-####
|
BLD15-01520
| BLD-Footing | 12/10/2015 | 12/10/2015 | 12/10/2015 3:00:32 PM | P | NR |
|
|
Matt Phone #: ###-#### Need approved plan with all small docs. Special inspection not done. Footing to the South does not match plans.....Engineer to advise. Provide Stamped engineering details if plans are modified.
|
BLD15-01520
| BLD-Foundation | 12/10/2015 | 12/10/2015 | 12/10/2015 2:56:01 PM | P | CANC |
|
|
Rebar // Matt Phone #: ###-####
|
BLD15-01521
| BLD-Foundation | 12/10/2015 | 12/10/2015 | 12/10/2015 2:27:33 PM | P | NR |
|
|
Rebar // Jamal Phone #: ###-#### Special insp. required.......No inspection performed. Footing pad to the North.....is not complete per plan......Foundation wall intersects footing and footing not big enough. Engineer to advise. Contractor to provide small docs which were not attached to plan.
|
BLD15-03428
| BLD-Foundation | 12/9/2015 | 12/10/2015 | 12/10/2015 1:30:21 PM | A | PASS |
|
|
Kenny Phone #: ###-####
|
BLD14-02949
| BLD-Final | 12/9/2015 | 12/10/2015 | 12/10/2015 11:06:15 AM | A | PASS |
|
|
Jason Phone #: ###-####
|
BLD14-02949
| DOC - Permit Finaled | 12/10/2015 | 12/10/2015 | 12/10/2015 11:06:03 AM | P | PASS |
|
|
|
BLD15-03520
| BLD-Framing/Rough-in | 12/9/2015 | 12/10/2015 | 12/10/2015 10:54:05 AM | A | PASS |
|
|
Charlie Phone #: ###-####
|
BLD15-03000
| BLD-Framing/Rough-in | 12/9/2015 | 12/10/2015 | 12/10/2015 10:31:20 AM | A | PART |
|
|
Zach Phone #: ###-#### Wall Framing OK.....Told Zach that if he does not install Ext. door in break room.......AND omits Changing Room to have PDS approve as plan modification. Engineer is working on Roof trusses and framing additions or changes. (underside of roof will stay exposed). He is to call for insp when roof is completed. Any Engineering for roof structural changes shall be submitted to PDS for approval. (may be Strengthening trusses). Need special insp. report for insp of Epoxy bolting at new CMU openings. OK to insulate.
|