Inspections for the day of: Thursday, December 10, 2015.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-03445 BLD-Wall cover12/7/201512/10/201512/10/2015 3:13:28 PMPDONE
Please call for access to home. Lockbox on front door. Phone #: ###-#### Inspection requested via web by Rick Heinzelman
BLD14-02901 BLD-Final12/10/201512/10/201512/10/2015 2:57:26 PMPPASS
BLD14-02901 DOC - Permit Finaled12/10/201512/10/201512/10/2015 2:57:19 PMPPASS
BLD14-02901 BLD-Framing/Rough-in12/10/201512/10/201512/10/2015 2:57:08 PMPPASS
Doug Phone #: ###-####
BLD15-03507 BLD-Framing/Rough-in12/10/201512/10/201512/10/2015 2:35:19 PMPPASS
Phone #: ###-#### Inspection requested via web by Chris Eby
BLD15-03507 BLD-Wall cover12/10/201512/10/201512/10/2015 2:34:58 PMPPASS
We need a framing inspection for approval to cover walls. Please give me a call half an hour before the inspection. Phone #: ###-#### Inspection requested via web by Chris Eby
BLD15-04321 BLD-Final12/10/201512/10/201512/10/2015 2:05:01 PMPNH
Walter Phone #: ###-####
BLD15-04321 DOC - Permit Finaled12/10/201512/10/201512/10/2015 2:04:51 PMPPASS
BLD15-03286 BLD-Final12/9/201512/10/201512/10/2015 2:04:11 PMPPASS
Phone #: ###-#### Inspection requested via web by Darius Saxton
BLD15-03286 DOC - Permit Finaled12/10/201512/10/201512/10/2015 2:03:40 PMPPASS
BLD15-04254 BLD-Final12/10/201512/10/201512/10/2015 1:22:11 PMPFAIL
Ashley Phone #: ###-####. MAin stirs need landing and compliant handrail.
BLD15-04181 BLD-Foundation12/9/201512/10/201512/10/2015 11:25:42 AMAPASS
Warren Phone #: ###-####
BLD15-04339 BLD-Framing/Rough-in12/9/201512/10/201512/10/2015 11:08:06 AMAPASS
Keith-please call 1 hr prior to meet-would like as early as possible Phone #: ###-####
BLD13-02186 BLD-Energy code compliance12/9/201512/10/201512/10/2015 10:35:00 AMAPART
Tod Phone #: ###-####. Work in progress, basement. Also reviewed draft stop locations.
MIS15-00304 BLD-Conference12/9/201512/10/201512/10/2015 9:51:41 AMAPASS
Ext 113 - Angie Phone #: ###-####. All work appears to have been done according to the approved plans and notes. Also noted that floor plan also matches. Gave all paper work to Angie including form 528 to complete.
BLD15-03758 BLD-Wall Bracing12/9/201512/10/201512/10/2015 8:47:41 AMAPASS
Wayne Phone #: ###-####
MIS15-00305 BLD-Conference12/9/201512/10/201512/10/2015 8:19:49 AMAPASS
Complaint that a ramp is being built without a permit.
MIS15-00305 DOC - Permit Finaled12/10/201512/10/201512/10/2015 8:18:24 AMPPASS
A building permit is not required for work being done.
BLD15-03931 BLD-Footing12/10/201512/10/201512/10/2015 12:00:00 AMPCANC
Chris Phone #: ###-####
BLD15-03029 BLD-Wall cover2/10/201612/10/201512/10/2015 12:00:00 AMPPASS
We need a framing inspection for approval to cover walls. Please give me a call half an hour before the inspection. Phone #: ###-#### Inspection requested via web by Chris Eby
BLD15-03029 BLD-Framing/Rough-in2/10/201612/10/201512/10/2015 12:00:00 AMPPASS
Phone #: ###-#### Inspection requested via web by Chris Eby