ELE18-00275
| Final | 12/10/2018 | 12/10/2018 | 12/11/2018 6:15:30 AM | P | FAIL |
|
|
Greg Phone #: ###-#### 1. 2 blanks needed kitchen cabinets N side kitchen. 2. Flex and disc for furnace down S side. 3. Up floor outlet needs trimmed. 4. 2 recepts need moved to countertop location and not on the sides. N counter of kitch. If someone is physically impaired there is an exception which allows outlets to stay on sides of cabinet. Pop outlets may also be used. 5. Lockouts for micro and range W side of kitch. 6. Remove fixture above mstr tub location and blank off. 210.52(C)(5). 7. Smoke detectors not on ARC fault.
|
ELE18-04324
| Rough-In Permanent Service | 12/10/2018 | 12/10/2018 | 12/10/2018 3:26:26 PM | P | PASS |
|
|
Please do a later inspection if possible. Inspect the new main and mast so ID Power can come relocate main service line on Wednesday. Phone #: ###-#### Inspection requested via web by Brian Gifford p/s o/h n ok Homeowner to shore up overhead mast more. It was braced for the ease of mounting the service. He explained to me what he was going to do. Will go by tomorrow to double check before Wed energize. This new service to re-feed house.
|
ELE18-04680
| Conference | 12/10/2018 | 12/10/2018 | 12/10/2018 2:36:53 PM | P | CANC |
|
|
Please call when you are ready to head that way. I should be able to meet you there. Otherwise we can discuss on the phone while you take a look. Thanks Phone #: ###-#### Inspection requested via web by Troy Cobb Re-schedules for 12/11
|
ELE18-04644
| Electrical Rough-In | 12/10/2018 | 12/10/2018 | 12/10/2018 2:11:31 PM | P | PASS |
|
|
Rough-in inspection for kitchen. Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover kitchen
|
ELE18-04686
| Rough-In Permanent Service | 12/10/2018 | 12/10/2018 | 12/10/2018 2:11:14 PM | P | PASS |
|
|
Inspection requested via web by Ryan Wilson Ok cover trench kitchen for island. p/s u/g n ok
|
ELE18-03716
| Final | 12/10/2018 | 12/10/2018 | 12/10/2018 2:10:39 PM | P | PASS |
|
|
garage code 1957e Phone #: ###-#### Inspection requested via web by Alan Lusk Ok final.
|
ELE18-03594
| Final | 12/7/2018 | 12/10/2018 | 12/10/2018 11:27:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by danny perrine Ok final.
|
ELE18-04425
| Electrical Rough-In | 12/10/2018 | 12/10/2018 | 12/10/2018 10:23:12 AM | P | PASS |
|
|
need ok for floor cover master bath 2nd floor Phone #: ###-#### Inspection requested via web by dennis mcneely Ok cover floor up mstr bath.
|
ELE18-04453
| Final | 12/7/2018 | 12/10/2018 | 12/10/2018 9:28:51 AM | A | PASS |
|
|
Solar system complete and ready for inspection. Approved plans are on site and all work was done according to plans. Call me if you have any questions at 850 8965 Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King Ok final. All labels present. Placard for disconnect location on meter on N side of house.
|
ELE18-03893
| Final | 12/6/2018 | 12/10/2018 | 12/10/2018 9:08:37 AM | A | PASS |
|
|
Gate code #2208 Shop will be open for access Phone #: ###-#### Inspection requested via web by Heath Thomas Ok final shop.
|