FIR18-00709
| INSP-Final Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 2:46:51 PM | P | FAIL |
|
|
Need earthquake bracing as discussed.
Jermey Phone #: ###-####
|
NAF18-00096
| INSP-Final | 12/10/2018 | 12/10/2018 | 12/10/2018 2:46:14 PM | P | FAIL |
|
|
Remove the exit sign as discussed at the blocked door.
Call prior to going Phone #: 8174129198 >> Inspection requested via mobile web by Ryan
|
BLD17-03168
| FIRE-Final Inspection | 12/6/2018 | 12/10/2018 | 12/10/2018 1:33:00 PM | P | FAIL |
|
|
Provide testing of all exit signs and emergency lights, provide interconnection of the door mag and the fire alarm system as discussed and as IFC chapter 10, Provide verification/testing of the duct smoke detector and the new 6 ton hvac unit
Call ahead to meet // Chip Phone #: ###-####
|
NAF18-00091
| INSP-Final | 12/7/2018 | 12/10/2018 | 12/10/2018 10:55:27 AM | A | DONE |
|
|
life safety passed
Call prior to going Phone #: 9152046345 >> Inspection requested via mobile web by George Gebran
|
BLD18-01641
| FIRE-Final Inspection | 12/7/2018 | 12/10/2018 | 12/10/2018 10:43:50 AM | A | PASS |
|
|
life safety passed
Gary-units103,106,117,118,125,134,138,205,237,242, 102,104,140,141,142 Phone #: ###-####
|
FIR18-00609
| INSP-Final Inspection | 12/7/2018 | 12/10/2018 | 12/10/2018 9:56:15 AM | A | CANC |
|
|
Not ready for final yet.
As-Builts have been approved by Tim Frost. Insulation has bee fixed. Robert Mullins is Foreman on job. Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
FIR18-00609
| INSP-Sprinkler Rough-in | 12/7/2018 | 12/10/2018 | 12/10/2018 9:55:42 AM | A | PART |
|
|
See the city approved plans for locations that need corrections that include insulation blocking heads in the attic, insulation needs to be provided in one location and removed in another at the east exterior exit, it appears per the data sheet that the COIN heads have been installed correctly. Areas in question have been marked on the plans.
As-Builts have been approved by Tim Frost. Insulation has bee fixed. Robert Mullins is Foreman on job. Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
FIR18-00749
| INSP-Sprinkler Rough-in | 12/7/2018 | 12/10/2018 | 12/10/2018 8:01:56 AM | A | PASS |
|
|
Rough-in passed. Piping is ok for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|