Inspections for the day of: Monday, December 10, 2018.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00709 INSP-Final Inspection12/10/201812/10/201812/10/2018 2:46:51 PMPFAIL
Need earthquake bracing as discussed.

Jermey Phone #: ###-####
NAF18-00096 INSP-Final12/10/201812/10/201812/10/2018 2:46:14 PMPFAIL
Remove the exit sign as discussed at the blocked door.

Call prior to going Phone #: 8174129198 >> Inspection requested via mobile web by Ryan
BLD17-03168 FIRE-Final Inspection12/6/201812/10/201812/10/2018 1:33:00 PMPFAIL
Provide testing of all exit signs and emergency lights, provide interconnection of the door mag and the fire alarm system as discussed and as IFC chapter 10, Provide verification/testing of the duct smoke detector and the new 6 ton hvac unit


Call ahead to meet // Chip Phone #: ###-####
NAF18-00091 INSP-Final12/7/201812/10/201812/10/2018 10:55:27 AMADONE
life safety passed


Call prior to going Phone #: 9152046345 >> Inspection requested via mobile web by George Gebran
BLD18-01641 FIRE-Final Inspection12/7/201812/10/201812/10/2018 10:43:50 AMAPASS
life safety passed


Gary-units103,106,117,118,125,134,138,205,237,242, 102,104,140,141,142 Phone #: ###-####
FIR18-00609 INSP-Final Inspection12/7/201812/10/201812/10/2018 9:56:15 AMACANC
Not ready for final yet.

As-Builts have been approved by Tim Frost. Insulation has bee fixed. Robert Mullins is Foreman on job. Phone #: ###-#### Inspection requested via web by Brett Lawatch
FIR18-00609 INSP-Sprinkler Rough-in12/7/201812/10/201812/10/2018 9:55:42 AMAPART
See the city approved plans for locations that need corrections that include insulation blocking heads in the attic, insulation needs to be provided in one location and removed in another at the east exterior exit, it appears per the data sheet that the COIN heads have been installed correctly. Areas in question have been marked on the plans.


As-Builts have been approved by Tim Frost. Insulation has bee fixed. Robert Mullins is Foreman on job. Phone #: ###-#### Inspection requested via web by Brett Lawatch
FIR18-00749 INSP-Sprinkler Rough-in12/7/201812/10/201812/10/2018 8:01:56 AMAPASS
Rough-in passed. Piping is ok for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball