Inspections for the day of: Tuesday, December 11, 2001.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01228 BLD-Aging Inspection12/11/200112/11/200112/18/2001 12:00:00 AM NR
parking lot, need all other ok's....in front of st lukes... 12/18/2001 11:43:13 AM
BLD01-01449 BLD-Aging Inspection12/11/200112/11/200112/17/2001 12:00:00 AM NR
called Josh, says P&Z has signed...take card to office asap 12/17/2001 3:10:33 PM
BLD01-01260 BLD-Aging Inspection12/11/200112/11/200112/13/2001 12:00:00 AM NR
will need a visit...unable to contact at this time. 12/13/2001 9:21:29 AM
MIS01-00086 MIS-Aging Inspection12/11/200112/11/200112/11/2001 12:00:00 AM NR
grading, need pub. wks (Brian Murphey) ok for final...chk w/ project A. Morrison Park Apts. 12/11/2001 2:17:05 PM
BLD01-01859 BLD-Aging Inspection12/11/200112/11/200112/11/2001 12:00:00 AM NR
roof, exp 1-7-02 12/11/2001 2:17:48 PM
BLD01-01237 BLD-Aging Inspection12/11/200112/11/200112/11/2001 12:00:00 AM PASS
exp 12/11/2001 2:13:17 PM
BLD01-03160 BLD-Conference12/11/200112/11/200112/11/2001 12:00:00 AMAPART
Added by Inspector: 340 On 12/11/2001 11:49:12 AM w/ owner, may need site visit re light-ventilation for int room
BLD98-03705 BLD-Foundation12/11/200112/11/200112/11/2001 12:00:00 AMAPART
Added by Inspector: 340 On 12/11/2001 12:02:41 PM observed 12th (of 30) caisson pour...met w/ Chris Schiappa & Mike Spiker of MTI onsite....Mike recommends coring caissons at SW corner for add'l test; Chris states soil bearing numbers are ok...there is a clay layer that will impact mat bearing, contractor has been informed. Contractor is using pump/tremmie to displace ground water. Eng'r to address soil depth/ protection of Eastman garage ftgs...grade beam is partially exposed
BLD01-02093 BLD-Final12/10/200112/11/200112/11/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/10/2001 at 15:22:44. Contact: ###-####.
BLD00-01649 BLD-Framing/Rough-in12/10/200112/11/200112/11/2001 12:00:00 AMAPART
MEL ###-#### need chk sf dampers at elev lobbies, wip 12/11/2001 6:26:42 PM
BLD00-03538 BLD-Conference12/11/200112/11/200112/11/2001 12:00:00 AMAPART
Added by Inspector: 340 On 12/11/2001 9:44:03 AM w/ John R.(?) arch w/ CHSQA re occ sep...1hr sep preferred/ req'd w/ shell as office tenant(McAlvaine) wants temp occ...
BLD00-03538 BLD-Framing/Rough-in12/11/200112/11/200112/11/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/11/2001 at 09:40:36. Contact: ###-####...wip, need wrap beams at upper level, ok to infill deck, seal shafts 12/11/2001 6:24:17 PM
BLD01-00596 BLD-Framing/Rough-in12/11/200112/11/200112/11/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/11/2001 at 10:30:24. Contact: ###-####....c/n, show revised eng'g for 1st fl. shear, air seal, cripples over hdrs, hvac ok? 12/11/2001 4:19:58 PM
BLD01-01635 BLD-Conference12/11/200112/11/200112/11/2001 12:00:00 AMPPASS
###-#### w/ owner re duplex req's for elec service...one only. 12/11/2001 3:17:27 PM
BLD01-00604 BLD-Framing/Rough-in12/11/200112/11/200112/11/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/11/2001 at 11:05:34. Contact: . c/n, see bld01-00594 12/11/2001 4:21:20 PM
BLD01-03160 BLD-Conference12/10/200112/11/200112/11/2001 12:00:00 AMPPASS
###-#### w/owner...lite ok if passage to expanded bedrom is as shown, approx. 1/2 open at common wall, min 12 s.f. per room dimension. 12/11/2001 3:09:20 PM
BLD01-02149 BLD-Framing/Rough-in12/10/200112/11/200112/11/2001 12:00:00 AMPPART
###-#### gary...ok to insul throughout...still need hvac r/i ok. 12/11/2001 9:40:48 AM