BLD01-01132
| BLD-Aging Inspection | 12/11/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | | PART |
|
|
wip 12/11/2001 8:39:00 AM
|
BLD01-01119
| BLD-Aging Inspection | 12/11/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | | FAIL |
|
|
permit expired 12/11/2001 8:38:20 AM
|
BLD01-02765
| BLD-Framing/Rough-in | 12/10/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | A | PART |
|
|
###-#### ok to cover except 4 ply grider in garage-engineering or 1/2" bolts need to be installed. 12/11/2001 9:14:38 AM
|
BLD01-01729
| BLD-Framing/Rough-in | 12/10/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 12:22:29. Contact: . c/n no approved plans on site 12/11/2001 11:12:51 AM
|
BLD01-02512
| BLD-Framing/Rough-in | 12/10/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | A | PASS |
|
|
ED ###-#### SHEAR--ok to side 12/11/2001 9:35:08 AM
|
BLD01-02765
| BLD-Wall cover | 12/11/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 420 On 12/11/2001 10:28:52 AM Engineering on the 4 ply grider truss was provided and installation is acceptable. ok to cover 12/11/2001 10:30:03 AM
|
BLD01-02795
| BLD-Framing/Rough-in | 12/11/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 07:13:14. Contact: ###-####. holdowns not installed, nailing light on shear panels. 12/11/2001 10:07:42 AM
|
BLD01-02921
| BLD-Framing/Rough-in | 12/11/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | P | PART |
|
|
###-#### SHEAR--OK TO SIDE---MISSING HD-RIGHT OF DOOR-RETROFIT OR ENG. AT FRAMING. 12/11/2001 2:00:29 PM
|
BLD01-02795
| BLD-Framing/Rough-in | 12/11/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 10:03:26. Contact: ###-####. SHEAR not framing--c/n posted--ok to side garage only. 12/11/2001 2:34:29 PM
|
BLD01-00083
| BLD-Final | 12/11/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 10:18:20. Contact: ###-####. c/n--tempered glass(kitchen), visqueen coverage and insulation in crawl and fire caulding needed in garage at 1-hr firewall. 12/11/2001 1:39:09 PM
|
BLD01-02077
| BLD-Final | 12/11/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 11:00:13. Contact: ###-####. Mechanical final did not pass this a.m. Contacted builder--will reschedule. 12/11/2001 3:43:57 PM
|
BLD01-02451
| BLD-Framing/Rough-in | 12/11/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | P | FAIL |
|
|
RANDY ###-#### SHEER WALL--no approved plans on site--re-call for inspection. 12/11/2001 2:45:48 PM
|
BLD01-02795
| BLD-Framing/Rough-in | 12/11/2001 | 12/11/2001 | 12/11/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 07:10:37. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/11/2001 at 07:18:09.
|