ELE01-02928
| ELE-Aging Inspection | 12/11/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | | PART |
|
|
SUC 12/11/2002 10:34:36 AM
|
ELE01-03506
| ELE-Aging Inspection | 12/11/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | | PART |
|
|
stopped at job site they need to install #8 equipment grd for voltage drop 20 amp circuit with #8 phase and neutral 250.122(B) called Leon at Tri state he will check it out and get back with me and call for final 12/11/2002 6:45:34 PM
|
ELE01-03573
| ELE-Aging Inspection | 12/11/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | | PART |
|
|
stopped at job site called left message 12/11/2002 12:18:16 PM
|
ELE01-03782
| ELE-Aging Inspection | 12/11/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | | PART |
|
|
called contractor they wiil address it 12/16/2002 3:15:30 PM
12/16/2002 3:15:33 PM
|
ELE02-03826
| Temporary Service | 12/10/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | A | PASS |
|
|
dan ###-####
t/s u/g new ok 12/11/2002 11:33:58 AM
|
ELE02-03719
| Temporary Service | 12/10/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/10/2002 at 15:06:33. Contact: ###-####.
t/s u/g new ok 12/11/2002 11:01:09 AM
|
ELE01-03996
| Final | 12/10/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | A | FAIL |
|
|
###-####- joann-call 1st before insp -re-insp cor. posted called 110.26 shall provide required clearence in front of p/s, 250.140,142(B) needs 4 wire cable for range and dryer from sub panel or terminate range and dryer 3 wire cables at p/s 12/11/2002 2:24:09 PM
|
ELE02-03831
| Temporary Service | 12/11/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | P | PASS |
|
|
kirk- ###-#### t/s u/g new ok 12/11/2002 2:47:07 PM
|
ELE02-01270
| Electrical Rough-In | 12/11/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | P | PART |
|
|
NEEDS EXTENION \\###-#### ok for extenion 12/11/2002 2:29:23 PM
|
ELE02-03772
| Rough-In Permanent Service | 12/11/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung r/i only no p/s needs bond to water system called 12/11/2002 4:54:27 PM
|
ELE02-03786
| Rough-In Permanent Service | 12/11/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/11/2002 at 09:04:48. Contact: ###-####. see added r/i inspection cor. posted for p/s , 110.3(A) replace ringed wire meter and main breaker, called 12/11/2002 3:20:47 PM
|
ELE02-03586
| Electrical Rough-In | 12/11/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/11/2002 at 10:32:14. Contact: ###-####. cor. posted 300.14, 250.66 bond water with #4 200.7 old wiring white shall not be used as phase wire, 210.70 light fixture shall light back area, 314.23 cutin boxes shall be rigidly mounted in finish surfaces, 314.20 boxes set back more than 1/4 inch check out all old wiring 12/11/2002 5:56:44 PM
|
ELE02-03786
| Electrical Rough-In | 12/11/2002 | 12/11/2002 | 12/11/2002 12:00:00 AM | P | PASS |
|
|
r/i ok only cor. posted for p/s
|
ELE02-01402
| Final | 12/10/2002 | 12/11/2002 | 12/10/2002 12:00:00 AM | A | CANC |
|
|
###-#### mike Disp set to [CANC] by a contractor via Hello! on 12/10/2002 at 11:43:56.
|