Inspections for the day of: Wednesday, December 11, 2002.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS02-00154 MIS-Aging Inspection12/11/200212/11/200212/11/2002 12:00:00 AM PASS
MIS02-00162 MIS-Aging Inspection12/11/200212/11/200212/11/2002 12:00:00 AM PASS
BLD00-03212 BLD-Aging Inspection12/11/200212/11/200212/11/2002 12:00:00 AM PASS
BLD01-00318 BLD-Aging Inspection12/11/200212/11/200212/11/2002 12:00:00 AM DONE
BLD02-01261 BLD-Framing/Rough-in12/9/200212/11/200212/11/2002 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Virginia Thornley
BLD02-01261 BLD-Energy code compliance12/9/200212/11/200212/11/2002 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Virginia Thornley
BLD02-02358 BLD-Wall cover12/10/200212/11/200212/11/2002 12:00:00 AMAPASS
Interior sheer wall inspection per plan; Phone #: ###-#### Internet Inspection Request from: alan gossi
BLD02-02875 BLD-Footing12/10/200212/11/200212/11/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/10/2002 at 17:38:59. Contact: ###-####. work in progress 20% completed 12/11/2002 2:11:39 PM
BLD02-02021 BLD-Wall cover12/10/200212/11/200212/11/2002 12:00:00 AMAPASS
Interior wall inspection per plan; Phone #: ###-#### Internet Inspection Request from: alan gossi
BLD02-01795 BLD-Framing/Rough-in12/11/200212/11/200212/11/2002 12:00:00 AMPPASS
camil; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie all c/n items completed 12/11/2002 4:53:42 PM
BLD02-01525 BLD-Final12/11/200212/11/200212/11/2002 12:00:00 AMPFAIL
rader--gar door code is 1128; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie insulate rim in crawel 12/11/2002 3:16:13 PM
BLD02-02484 BLD-Framing/Rough-in12/11/200212/11/200212/11/2002 12:00:00 AMPFAIL
###-#### wayne needs foam seal package installed befor schduling a framing inspection 12/11/2002 4:59:17 PM
BLD02-02872 BLD-Footing12/11/200212/11/200212/11/2002 12:00:00 AMPPASS
jose; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD01-03272 BLD-Final12/11/200212/11/200212/11/2002 12:00:00 AMPPASS
###-####
MEC02-03609 Pressure Test12/11/200212/11/200212/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/11/2002 at 09:32:21. Contact: ###-####.
BLD02-00878 BLD-Framing/Rough-in12/11/200212/11/200212/11/2002 12:00:00 AMPFAIL
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung need to restaple areas that staple have been over shot need to add blocking in areas that blocking is missing need to retro fit hold down west side of front door were side lite was added in panel this was a shear wall inspection only c/n posted 12/11/2002 4:09:16 PM
BLD02-02878 BLD-Footing12/11/200212/11/200212/11/2002 12:00:00 AMPCANC
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung