ELE07-03789
| Final | 12/11/2007 | 12/11/2007 | 12/12/2007 10:01:52 AM | P | CANC |
|
|
dale Phone #: ###-#### wrong type request, see ri dated 12/12/07
|
ELE07-03927
| Conference | 12/9/2007 | 12/11/2007 | 12/11/2007 4:26:52 PM | P | DONE |
|
|
Scheduled by a contractor via Hello! on 12/9/2007 at 12:43:10 PM. Contact: ###-####. talked about bath remodel, circuits, when to call for ri, 1 1/4", free length of conductor, make-up, etc
|
ELE07-01624
| Electrical Rough-In | 12/11/2007 | 12/11/2007 | 12/11/2007 3:45:31 PM | P | PART |
|
|
carl Note: ceil Phone #: ###-#### ok to cover rest of dropped in ceilings anop, 1st floor only
|
ELE07-03458
| Final | 12/11/2007 | 12/11/2007 | 12/11/2007 3:04:01 PM | P | PASS |
|
|
bob Phone #: ###-#### ok to final
|
ELE06-00320
| Final | 12/11/2007 | 12/11/2007 | 12/11/2007 1:36:37 PM | P | PASS |
|
|
robert Phone #: ###-#### corrections made ok to final
|
ELE07-04087
| Electrical Rough-In | 12/11/2007 | 12/11/2007 | 12/11/2007 12:34:21 PM | P | PASS |
|
|
don Phone #: ###-#### ric ok upstairs only
|
ELE07-04065
| Electrical Rough-In | 12/11/2007 | 12/11/2007 | 12/11/2007 10:39:29 AM | A | PASS |
|
|
We have a few loose ends to wrap up should be done around 9:00 am. If you could come late morning that would be great. Thank you Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman water pipe bonded, ric ok
|
ELE07-04044
| Electrical Rough-In | 12/10/2007 | 12/11/2007 | 12/11/2007 9:53:43 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Alan Lusk called contractor, ric ok
|
ELE07-03603
| Electrical Rough-In | 12/10/2007 | 12/11/2007 | 12/11/2007 9:14:19 AM | A | PASS |
|
|
tolly Note: floor heat master bthroom & kitchen Phone #: ###-#### ok to cover floor heat in kitchen and master bath only
|
ELE07-03551
| Final | 12/10/2007 | 12/11/2007 | 12/11/2007 8:30:40 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/10/2007 at 12:38:17 PM. Contact: ###-####. ok to final
|