Inspections for the day of: Tuesday, December 11, 2007.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00091 INSP-Alarm Testing12/10/200712/11/200712/12/2007 9:26:58 AMPDONE
Area 6 has been finished up and area 8 almost finished. See the city approved plans for deficiencies in area 8.
FIR07-00726 INSP-Sprinkler Rough-in12/10/200712/11/200712/11/2007 4:04:46 PMAPASS
Sprinkler roughin passed. Piping can be covered in the layin ceiling areas. Could not perform the forward flush due to a guage problem.
FIR07-00909 INSP-Sprinkler Rough-in12/10/200712/11/200712/11/2007 2:54:22 PMAPART
The in building riser/stubout is ok to cover. The remaining underground has not been installed yet.
BLD07-03095 FIRE-Final Inspection12/10/200712/11/200712/11/2007 1:02:24 PMAPART
A temporary occupancy was given until emergency lighting is provided in the warehouse and the storage is limited to 5' as per the drawings until approved smoke and heat vents are installed.
FIR07-00836 INSP-Final Inspection12/10/200712/11/200712/11/2007 1:01:27 PMAFAIL
No approved plans on site. I did a quick walk through with the fitter and pointed out sprinkler coverage blocked by duct work.