BLD07-02126
| BLD-Final | 12/10/2007 | 12/11/2007 | 12/11/2007 4:13:23 PM | P | NR |
|
|
1/2 hour notice if possible please. thanks mike. Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD07-03095
| BLD-Final | 12/10/2007 | 12/11/2007 | 12/11/2007 3:25:19 PM | P | PASS |
|
|
Joe Please call 15 min before going out Phone #: ###-####. Temp occ granted, Will be ok for perm occ once lfe/safety goes perm.
|
BLD07-02038
| BLD-Conference | 12/10/2007 | 12/11/2007 | 12/11/2007 2:39:52 PM | P | DONE |
|
|
Met on site with architect conering issues noted on c/n that was issued. All items have been taken care of except for wood beam penetration at 2hr. fire barrier wall. Architect to provide alernate detail and submit to bldg. official for approval.
|
BLD07-02830
| BLD-Energy code compliance | 12/11/2007 | 12/11/2007 | 12/11/2007 2:06:00 PM | P | FAIL |
|
|
randy Phone #: ###-####. Needs to repair top chord of floor joist, Also needs to pull mech permit and get ri insp. prior to proceeding. c/n left on site.
|
BLD07-02221
| BLD-Foundation | 12/11/2007 | 12/11/2007 | 12/11/2007 1:43:52 PM | P | PASS |
|
|
dane Phone #: ###-####
|
BLD07-02160
| BLD-Foundation | 12/11/2007 | 12/11/2007 | 12/11/2007 1:43:34 PM | P | PASS |
|
|
dane Phone #: ###-####
|
BLD07-02442
| BLD-Aging Inspection | 12/11/2007 | 12/11/2007 | 12/11/2007 10:46:40 AM | | DONE |
|
|
|
BLD07-02442
| DOC - Permit Finaled | 12/11/2007 | 12/11/2007 | 12/11/2007 10:46:30 AM | P | PASS |
|
|
|
BLD07-01063
| BLD-Final | 12/10/2007 | 12/11/2007 | 12/11/2007 10:01:50 AM | A | PASS |
|
|
Clark Phone #: ###-####
|
BLD07-01063
| DOC - Permit Finaled | 12/11/2007 | 12/11/2007 | 12/11/2007 10:01:40 AM | P | PASS |
|
|
|
BLD06-02517
| BLD-Energy code compliance | 12/10/2007 | 12/11/2007 | 12/11/2007 9:20:50 AM | A | PASS |
|
|
jerry - insulation Phone #: ###-####
|