Inspections for the day of: Thursday, December 11, 2008.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00924 General Inspection12/11/200812/11/200812/12/2008 10:08:05 AMPPASS
All discharges persume to be clean water.
ESC06-00828 Aging Inspection12/11/200812/11/200812/11/2008 4:38:33 PM DONE
ESC06-00828 BMP Violation12/11/200812/11/200812/11/2008 4:37:55 PMPPASS
ESC06-00827 Aging Inspection12/11/200812/11/200812/11/2008 4:37:09 PM PASS
ESC06-00827 Site Final12/11/200812/11/200812/11/2008 4:36:46 PMPPASS
ESC06-00826 Aging Inspection12/11/200812/11/200812/11/2008 4:35:29 PM DONE
ESC06-00826 Site Final12/11/200812/11/200812/11/2008 4:35:12 PMPPASS
ESC08-00758 Random Inspection12/11/200812/11/200812/11/2008 1:49:22 PMPFAIL
Need to provide sediment protection on stock pile prior to 12/12/08 PM. Will re-inspect on 12/15/08 AM
ESC06-00829 Aging Inspection12/11/200812/11/200812/11/2008 1:09:05 PM DONE
ESC06-00829 Site Final12/11/200812/11/200812/11/2008 1:08:58 PMPPASS
ESC08-00737 Conference12/10/200812/11/200812/11/2008 12:51:19 PMAFAIL
Vebal correction to RP. Install a sediment and erosion products along the slope area where no protection is installed. Clean all hard surface of all sediment debris at the end of each working day. Provide an approved concrete washout prior to pour. Will re-inspect on 12/16/08.
ESC07-00904 Conference12/1/200812/11/200812/11/2008 12:48:19 PMAFAIL
All pertaining issue were shown to the RP by Steve Webb and I.
Correction Notice:
1. Protect all storm drain inletsthrough out project area, also including the drians within the overflow basins. (Secondary exturnal protection is required.)
2. Install sediment barriers in between hard surface and disturbed areas. (north side of football field.)
3.Stabilize as much bare ground as possible with some type of seed, tachifier, mulch mixture.
4. Maint the construction entrance.Top dressing and widening or reduce the access width.
5.Maintain fuel storage area liner.
6. Recommend a energy dissapaiters at all outfalls located at both basins.
7.Clean all curb gutters of sediment and debris. Will re-inspect on 12/16/08 AM.
ESC08-00924 General Inspection12/11/200812/11/200812/11/2008 9:49:05 AMAFAIL
Concerned with the side of the slope where the pumps are discharging out into the other side. Starting to see seepage of moisture coming trough. Potential blow is possible. Told the Pubkic Works Project Manager (Rocky) and showed him the issue. Need to ne addressed immeadiately. If not address a major issue with occur. Will re-inspect today in the PM.
ESC08-00865 Random Inspection12/11/200812/11/200812/11/2008 8:34:44 AMAFAIL
Verbal to RP:
1. Clean up all sediment and debris off of all hard surfaces.
2. Provide some type of sediment control of the north part of lot. (A refief trench will accepted.)
3. Provide a trash conainer of dump trailer for all solid waste generated from the project.
Will re-inspect on 12/15/08.
ESC03-01068 Site Final12/11/200812/11/200812/11/2008 8:20:18 AMAPASS
ESC03-00923 Site Final12/11/200812/11/200812/11/2008 8:20:05 AMAPASS
ESC03-01448 Site Final12/11/200812/11/200812/11/2008 8:19:56 AMAPASS
ESC03-01448 Site Final12/11/200812/11/200812/11/2008 8:19:43 AMAPASS
ESC03-00571 Site Final12/11/200812/11/200812/11/2008 8:19:33 AMAPASS
ESC03-00586 Site Final12/11/200812/11/200812/11/2008 8:19:24 AMAPASS

ESC03-00532 Site Final12/11/200812/11/200812/11/2008 8:19:12 AMAPASS
ESC08-00855 Random Inspection12/11/200812/11/200812/11/2008 8:18:09 AMAPASS
ESC08-01018 Site Preparation ESC12/11/200812/11/200812/11/2008 8:14:25 AM NR
No activity yet.