BLD12-02982
| FIRE-Final Inspection | 12/4/2012 | 12/11/2012 | 12/11/2012 3:40:25 PM | P | PASS |
|
|
life safety passed
|
FIR12-00690
| INSP-Final Inspection | 12/10/2012 | 12/11/2012 | 12/11/2012 3:10:05 PM | A | PASS |
|
|
permit finaled
|
FIR12-00675
| INSP-Conference | 12/10/2012 | 12/11/2012 | 12/11/2012 2:52:53 PM | A | DONE |
|
|
Brian and I went over audio/visual device placement/spacing issues and smoke detector placement in the exit corridors.
|
FIR12-00420
| INSP-Sprinkler Rough-in | 12/10/2012 | 12/11/2012 | 12/11/2012 2:06:35 PM | A | FAIL |
|
|
Tenting has not been repaired/completed.
|
FIR09-00051
| FIR-Aging Inspection | 12/11/2012 | 12/11/2012 | 12/11/2012 11:33:16 AM | | NR |
|
|
Waiting for Taylor Brothers to final permit
|
FIR12-00690
| INSP-Sprinkler Rough-in | 12/10/2012 | 12/11/2012 | 12/11/2012 10:36:14 AM | A | PASS |
|
|
Rough-in passed
|
BLD12-02490
| FIRE-Final Inspection | 12/10/2012 | 12/11/2012 | 12/11/2012 10:22:41 AM | A | PASS |
|
|
life safety passed
|