FIR13-00233
| INSP-Final Inspection | 12/5/2013 | 12/11/2013 | 12/18/2013 5:08:08 PM | P | PART |
|
|
partial final - Jonathan Phone #: ###-####
|
FIR13-00661
| INSP-Sprinkler Rough-in | 12/11/2013 | 12/11/2013 | 12/12/2013 1:56:50 PM | P | NR |
|
|
Stefan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
BLD13-01265
| FIRE-Final Inspection | 12/10/2013 | 12/11/2013 | 12/11/2013 1:49:29 PM | P | PASS |
|
|
Fire life safety passed pending repair of non-functional door hardware at the bid room per discussion.
|
BLD13-00938
| FIRE-Conference | 12/11/2013 | 12/11/2013 | 12/11/2013 12:49:53 PM | P | DEFR |
|
|
tim - fire walk 2:30 if possible Phone #: ###-####
|
BLD12-02721
| FIRE-Final Inspection | 12/10/2013 | 12/11/2013 | 12/11/2013 12:48:26 PM | A | PASS |
|
|
Fire life safety passed. *Signature card not available on site.
|
FIR12-00729
| INSP-Final Inspection | 12/10/2013 | 12/11/2013 | 12/11/2013 12:45:21 PM | A | PASS |
|
|
Fire alarm permit finaled.
|
FIR13-00579
| INSP-Sprinkler Rough-in/Hydro | 12/11/2013 | 12/11/2013 | 12/11/2013 12:00:00 AM | P | PASS |
|
|
Hydro 4th floor residential area passed.
|