BLD17-03407
| BLD-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/12/2019 1:27:12 PM | | FAIL |
|
|
|
BLD19-01257
| BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 3:55:13 PM | P | NR |
|
|
Loyd Phone #: ###-####,, needs egress,, handrail per code, fire caulking,, seal exterior doors as needed
|
BLD19-03920
| BLD-Energy code compliance | 12/11/2019 | 12/11/2019 | 12/11/2019 3:42:17 PM | P | PASS |
|
|
Bob Phone #: ###-####
|
MIS18-00431
| DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 3:07:06 PM | P | PASS |
|
|
|
MIS19-00417
| BLD-Conference | 12/11/2019 | 12/11/2019 | 12/11/2019 3:03:43 PM | P | PEND |
|
|
status// no new work is going on except the placement of driveway strips off the alley,, permits will be obtained prior to interior work,, owner is applying for ADU permits with zoning
|
BLD19-03046
| BLD-Energy code compliance | 12/11/2019 | 12/11/2019 | 12/11/2019 2:27:45 PM | P | PASS |
|
|
Jason Phone #: ###-####
|
BLD19-01509
| BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 2:11:20 PM | P | PEND |
|
|
Final inspection for poured in place concrete wall and stabilization. Phone #: ###-#### Inspection requested via web by Aitor Biain// needs final approval from public works
|
BLD19-04689
| BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 2:00:52 PM | P | NR |
|
|
The paperwork will be tucked in the wall with ribbon around it so you can see it. Phone #: ###-#### Inspection requested via web by Andy Kahl// needs letter from engineer approved by public works prior to the final,, per permit,,
|
BLD19-03226
| BLD-Energy code compliance | 12/10/2019 | 12/11/2019 | 12/11/2019 12:00:26 PM | A | PASS |
|
|
Kevin- Phone #: ###-####
|
BLD19-03046
| BLD-Energy code compliance | 12/10/2019 | 12/11/2019 | 12/11/2019 11:53:07 AM | A | NR |
|
|
Jason Phone #: ###-####// insulators just are starting,, will come back later in pm
|
BLD19-04689
| BLD-Final | 12/10/2019 | 12/11/2019 | 12/11/2019 11:29:59 AM | A | NR |
|
|
The paperwork will be tucked in the wall with ribbon around it so you can see it. Phone #: ###-#### Inspection requested via web by Andy Kahl// needs hillside approval 1st per permit
|
BLD19-01509
| BLD-Final | 12/10/2019 | 12/11/2019 | 12/11/2019 11:29:11 AM | A | NR |
|
|
Final inspection for poured in place concrete wall and stabilization. Phone #: ###-#### Inspection requested via web by Aitor Biain// needs hillside 1st
|
BLD19-01257
| BLD-Final | 12/10/2019 | 12/11/2019 | 12/11/2019 11:27:52 AM | A | DEFR |
|
|
Loyd Phone #: ###-####.. defr to pm
|
MIS19-00417
| BLD-Conference | 12/10/2019 | 12/11/2019 | 12/11/2019 11:27:03 AM | A | DEFR |
|
|
to pm
|
BLD19-03920
| BLD-Energy code compliance | 12/10/2019 | 12/11/2019 | 12/11/2019 11:26:18 AM | A | NR |
|
|
Bob Phone #: ###-####
|
BLD19-02330
| BLD-Framing/Rough-in | 12/9/2019 | 12/11/2019 | 12/11/2019 11:25:46 AM | A | NR |
|
|
Mary Phone #: ###-####,, walk through only
|
BLD18-03401
| BLD-Framing/Rough-in | 12/10/2019 | 12/11/2019 | 12/11/2019 11:24:46 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by chad christensen,, c/n posted,, ok to insulate,, needs to have full sprinkler pass prior to cover
|