BLD19-02955
| BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 4:01:35 PM | P | FAIL |
|
|
Randall Phone #: ###-####. Can not verfiy electrical final inspection. provide code compliant stairs, handrails and landing.
|
BLD19-04171
| BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 4:00:39 PM | P | FAIL |
|
|
Randall Phone #: ###-####Provide code compliant stairs, handrails and landings.
|
BLD18-03478
| BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 3:59:51 PM | P | FAIL |
|
|
Randall Phone #: ###-####. address issue not resolved.
|
BLD19-02953
| BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 3:59:12 PM | P | FAIL |
|
|
Randall Phone #: ###-####. Provide landings at bottom of both stairways. Provide code compliant stairs and handrails.
|
BLD18-02644
| BLD-Final | 12/10/2019 | 12/11/2019 | 12/11/2019 3:41:54 PM | P | PASS |
|
|
Jason Phone #: ###-####
|
BLD18-02644
| DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 3:41:46 PM | P | PASS |
|
|
|
BLD19-03389
| BLD-Framing/Rough-in | 12/10/2019 | 12/11/2019 | 12/11/2019 2:31:30 PM | P | PASS |
|
|
John Phone #: ###-####. Addition and detached shop only ok to insulate at this time. Detached music room has a shower and that at this time is not allowed. Also plumbing for a seperate sink has been installed that is not shown on approved plans.
|
BLD19-03933
| BLD-Foundation | 12/10/2019 | 12/11/2019 | 12/11/2019 2:28:29 PM | P | PART |
|
|
2:30 pour // Mark Phone #: ###-####
|
BLD19-04116
| BLD-Foundation | 12/10/2019 | 12/11/2019 | 12/11/2019 2:28:13 PM | P | PART |
|
|
2:30 pour // Mark Phone #: ###-####
|
BLD19-02431
| BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 1:51:00 PM | P | PASS |
|
|
DOUG Phone #: ###-####
|
BLD19-02431
| DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 1:50:53 PM | P | PASS |
|
|
|
BLD19-04372
| BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 1:38:16 PM | P | NR |
|
|
Dane Phone #: ###-####. No one on site. Concrete form work has not yet been constructed.
|
BLD19-04257
| BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 1:37:58 PM | P | DONE |
|
|
Dane Phone #: ###-####. No one on site. Concrete form work has not yet been constructed.
|
BLD19-04256
| BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 1:37:40 PM | P | NR |
|
|
Dane Phone #: ###-####. No one on site. Concrete form work has not yet been constructed.
|
BLD19-02930
| BLD-Wall Bracing | 12/10/2019 | 12/11/2019 | 12/11/2019 10:40:40 AM | A | NR |
|
|
Scott Phone #: ###-####. Moved to pm. inspection.
|
BLD19-03303
| BLD-Framing/Rough-in | 12/10/2019 | 12/11/2019 | 12/11/2019 10:07:44 AM | A | FAIL |
|
|
Anthony Phone #: ###-####. Complete lateral bracing on T15 trusses. Install the missing MSTA 24 straps at RV bay per the engineering. Provide engineering showing the HDU 4 holdownsx at RV bay are sufficient in leiu of the STDH14. Install the missing STDH10 straps at back patio. Install theSTG224 straps at top plate to beam at back patio. Correction notice posted. Ok to insulate.
|
BLD19-03068
| BLD-Framing/Rough-in | 12/10/2019 | 12/11/2019 | 12/11/2019 9:03:59 AM | A | PASS |
|
|
jUSTIN Phone #: ###-####
|
BLD19-04249
| BLD-Framing/Rough-in | 12/10/2019 | 12/11/2019 | 12/11/2019 8:41:48 AM | A | PASS |
|
|
Jeff Phone #: ###-####
|